Demo Beton Alpha - Batches
Concrete Plant
Total Cycles:
788
Production:
4345,3 m3
Showing 701 to 788 of 788 cycles
| Start Time | End Time | Durată | Production | |
|---|---|---|---|---|
| 2026-01-04 19:00:00 | 2026-01-04 19:05:09 | 5,165711 | 5,9 m3 | |
|
|
||||
| 2026-01-04 18:00:00 | 2026-01-04 18:06:43 | 6,731193149999999 | 7,8 m3 | |
|
|
||||
| 2026-01-04 17:09:09 | 2026-01-04 17:09:51 | 0,6867098833333334 | 0,8 m3 | |
|
|
||||
| 2026-01-04 17:00:00 | 2026-01-04 17:06:54 | 6,914535116666667 | 7,9 m3 | |
|
|
||||
| 2026-01-04 16:06:04 | 2026-01-04 16:09:04 | 3,01028105 | 3,6 m3 | |
|
|
||||
| 2026-01-04 16:00:00 | 2026-01-04 16:04:03 | 4,053762166666667 | 5,4 m3 | |
|
|
||||
| 2026-01-04 15:00:00 | 2026-01-04 15:04:34 | 4,5767953 | 5,6 m3 | |
|
|
||||
| 2026-01-04 14:00:00 | 2026-01-04 14:03:15 | 3,2531799333333336 | 3,5 m3 | |
|
|
||||
| 2026-01-04 13:07:14 | 2026-01-04 13:07:59 | 0,7456203666666668 | 1,0 m3 | |
|
|
||||
| 2026-01-04 13:00:00 | 2026-01-04 13:05:57 | 5,958734166666667 | 7,2 m3 | |
|
|
||||
| 2026-01-04 12:06:13 | 2026-01-04 12:08:13 | 2,006649716666667 | 2,8 m3 | |
|
|
||||
| 2026-01-04 12:00:00 | 2026-01-04 12:05:03 | 5,051171416666667 | 5,8 m3 | |
|
|
||||
| 2026-01-04 11:07:28 | 2026-01-04 11:09:51 | 2,39483445 | 2,4 m3 | |
|
|
||||
| 2026-01-04 11:00:00 | 2026-01-04 11:05:09 | 5,153374583333333 | 6,6 m3 | |
|
|
||||
| 2026-01-04 10:06:41 | 2026-01-04 10:08:21 | 1,6686626833333333 | 1,9 m3 | |
|
|
||||
| 2026-01-04 10:00:00 | 2026-01-04 10:05:03 | 5,054836383333334 | 5,7 m3 | |
|
|
||||
| 2026-01-04 09:00:00 | 2026-01-04 09:03:44 | 3,7459461166666665 | 4,3 m3 | |
|
|
||||
| 2026-01-03 21:00:00 | 2026-01-03 21:00:38 | 0,6389683500000001 | 1,0 m3 | |
|
|
||||
| 2026-01-03 20:00:00 | 2026-01-03 20:02:02 | 2,0351468333333336 | 2,9 m3 | |
|
|
||||
| 2026-01-03 19:00:00 | 2026-01-03 19:03:56 | 3,9438436 | 4,8 m3 | |
|
|
||||
| 2026-01-03 18:00:00 | 2026-01-03 18:05:21 | 5,354351183333334 | 5,5 m3 | |
|
|
||||
| 2026-01-03 17:00:00 | 2026-01-03 17:06:12 | 6,200464766666667 | 7,2 m3 | |
|
|
||||
| 2026-01-03 16:00:00 | 2026-01-03 16:06:04 | 6,076331566666667 | 7,4 m3 | |
|
|
||||
| 2026-01-03 15:00:00 | 2026-01-03 15:03:05 | 3,0938984333333335 | 3,3 m3 | |
|
|
||||
| 2026-01-03 14:00:00 | 2026-01-03 14:02:28 | 2,4788117499999998 | 2,5 m3 | |
|
|
||||
| 2026-01-03 13:06:24 | 2026-01-03 13:07:17 | 0,8809697833333333 | 1,0 m3 | |
|
|
||||
| 2026-01-03 13:00:00 | 2026-01-03 13:04:20 | 4,3466172 | 5,8 m3 | |
|
|
||||
| 2026-01-03 12:00:00 | 2026-01-03 12:06:23 | 6,399318916666667 | 7,8 m3 | |
|
|
||||
| 2026-01-03 11:06:29 | 2026-01-03 11:07:42 | 1,2174607333333334 | 1,6 m3 | |
|
|
||||
| 2026-01-03 11:00:00 | 2026-01-03 11:04:24 | 4,411405149999999 | 5,0 m3 | |
|
|
||||
| 2026-01-03 10:00:00 | 2026-01-03 10:05:17 | 5,2989658833333335 | 5,7 m3 | |
|
|
||||
| 2026-01-03 09:00:00 | 2026-01-03 09:03:23 | 3,3893662166666667 | 3,4 m3 | |
|
|
||||
| 2026-01-02 21:00:00 | 2026-01-02 21:01:55 | 1,9291322499999999 | 2,0 m3 | |
|
|
||||
| 2026-01-02 20:06:54 | 2026-01-02 20:07:39 | 0,7438505333333333 | 1,0 m3 | |
|
|
||||
| 2026-01-02 20:00:00 | 2026-01-02 20:04:32 | 4,5465608 | 5,2 m3 | |
|
|
||||
| 2026-01-02 19:07:10 | 2026-01-02 19:10:02 | 2,8617567833333335 | 3,1 m3 | |
|
|
||||
| 2026-01-02 19:00:00 | 2026-01-02 19:05:59 | 5,99344515 | 7,1 m3 | |
|
|
||||
| 2026-01-02 18:13:44 | 2026-01-02 18:16:02 | 2,30605 | 2,6 m3 | |
|
|
||||
| 2026-01-02 18:07:44 | 2026-01-02 18:12:07 | 4,382588433333334 | 4,2 m3 | |
|
|
||||
| 2026-01-02 18:00:00 | 2026-01-02 18:05:21 | 5,353009283333334 | 6,0 m3 | |
|
|
||||
| 2026-01-02 17:14:47 | 2026-01-02 17:17:42 | 2,9120923 | 3,6 m3 | |
|
|
||||
| 2026-01-02 17:07:33 | 2026-01-02 17:11:53 | 4,331380566666667 | 5,4 m3 | |
|
|
||||
| 2026-01-02 17:00:00 | 2026-01-02 17:05:06 | 5,107388666666667 | 6,7 m3 | |
|
|
||||
| 2026-01-02 16:15:12 | 2026-01-02 16:15:56 | 0,7281757666666666 | 0,6 m3 | |
|
|
||||
| 2026-01-02 16:09:36 | 2026-01-02 16:13:52 | 4,2794722499999995 | 5,5 m3 | |
|
|
||||
| 2026-01-02 16:00:00 | 2026-01-02 16:07:32 | 7,533854116666666 | 8,9 m3 | |
|
|
||||
| 2026-01-02 15:08:31 | 2026-01-02 15:09:54 | 1,3816591833333334 | 2,0 m3 | |
|
|
||||
| 2026-01-02 15:00:00 | 2026-01-02 15:05:59 | 5,988578166666667 | 7,8 m3 | |
|
|
||||
| 2026-01-02 14:00:00 | 2026-01-02 14:05:28 | 5,47752535 | 5,6 m3 | |
|
|
||||
| 2026-01-02 13:08:20 | 2026-01-02 13:13:21 | 5,0161549 | 6,8 m3 | |
|
|
||||
| 2026-01-02 13:00:00 | 2026-01-02 13:06:39 | 6,65524875 | 8,1 m3 | |
|
|
||||
| 2026-01-02 12:08:37 | 2026-01-02 12:14:43 | 6,099318616666666 | 7,0 m3 | |
|
|
||||
| 2026-01-02 12:00:00 | 2026-01-02 12:06:31 | 6,52456015 | 7,7 m3 | |
|
|
||||
| 2026-01-02 11:08:14 | 2026-01-02 11:14:07 | 5,884896566666667 | 6,7 m3 | |
|
|
||||
| 2026-01-02 11:00:00 | 2026-01-02 11:06:32 | 6,541983383333333 | 7,8 m3 | |
|
|
||||
| 2026-01-02 10:13:47 | 2026-01-02 10:14:41 | 0,8974669833333333 | 1,0 m3 | |
|
|
||||
| 2026-01-02 10:06:06 | 2026-01-02 10:12:46 | 6,6632088666666665 | 7,8 m3 | |
|
|
||||
| 2026-01-02 10:00:00 | 2026-01-02 10:04:14 | 4,2474992 | 5,9 m3 | |
|
|
||||
| 2026-01-02 09:06:36 | 2026-01-02 09:07:13 | 0,6152262833333333 | 1,0 m3 | |
|
|
||||
| 2026-01-02 09:00:00 | 2026-01-02 09:05:34 | 5,56986205 | 6,1 m3 | |
|
|
||||
| 2026-01-01 21:00:00 | 2026-01-01 21:01:55 | 1,92678535 | 2,9 m3 | |
|
|
||||
| 2026-01-01 20:06:12 | 2026-01-01 20:07:05 | 0,8857657499999999 | 1,0 m3 | |
|
|
||||
| 2026-01-01 20:00:00 | 2026-01-01 20:04:31 | 4,5166802 | 5,4 m3 | |
|
|
||||
| 2026-01-01 19:09:10 | 2026-01-01 19:10:32 | 1,3673641 | 1,5 m3 | |
|
|
||||
| 2026-01-01 19:00:00 | 2026-01-01 19:06:58 | 6,9695169833333335 | 9,8 m3 | |
|
|
||||
| 2026-01-01 18:08:51 | 2026-01-01 18:14:01 | 5,176301216666667 | 6,0 m3 | |
|
|
||||
| 2026-01-01 18:00:00 | 2026-01-01 18:06:45 | 6,750783966666666 | 8,6 m3 | |
|
|
||||
| 2026-01-01 17:13:49 | 2026-01-01 17:17:43 | 3,8954160333333334 | 4,5 m3 | |
|
|
||||
| 2026-01-01 17:05:39 | 2026-01-01 17:11:08 | 5,483232416666667 | 6,0 m3 | |
|
|
||||
| 2026-01-01 17:00:00 | 2026-01-01 17:04:34 | 4,57195455 | 5,7 m3 | |
|
|
||||
| 2026-01-01 16:15:49 | 2026-01-01 16:16:27 | 0,6334427166666666 | 1,0 m3 | |
|
|
||||
| 2026-01-01 16:07:35 | 2026-01-01 16:14:34 | 6,9877833 | 8,5 m3 | |
|
|
||||
| 2026-01-01 16:00:00 | 2026-01-01 16:05:28 | 5,475782283333333 | 6,2 m3 | |
|
|
||||
| 2026-01-01 15:07:24 | 2026-01-01 15:10:22 | 2,9770997166666664 | 3,8 m3 | |
|
|
||||
| 2026-01-01 15:00:00 | 2026-01-01 15:04:31 | 4,522072966666667 | 5,3 m3 | |
|
|
||||
| 2026-01-01 14:00:00 | 2026-01-01 14:05:05 | 5,095250333333333 | 6,5 m3 | |
|
|
||||
| 2026-01-01 13:08:10 | 2026-01-01 13:14:28 | 6,294517616666667 | 6,7 m3 | |
|
|
||||
| 2026-01-01 13:00:00 | 2026-01-01 13:05:46 | 5,777830716666667 | 7,5 m3 | |
|
|
||||
| 2026-01-01 12:14:48 | 2026-01-01 12:17:54 | 3,0992932166666667 | 3,2 m3 | |
|
|
||||
| 2026-01-01 12:06:47 | 2026-01-01 12:12:25 | 5,646590533333334 | 7,3 m3 | |
|
|
||||
| 2026-01-01 12:00:00 | 2026-01-01 12:04:45 | 4,7527118999999995 | 5,1 m3 | |
|
|
||||
| 2026-01-01 11:16:02 | 2026-01-01 11:19:02 | 3,0002104833333334 | 3,9 m3 | |
|
|
||||
| 2026-01-01 11:07:13 | 2026-01-01 11:13:09 | 5,928326416666667 | 7,9 m3 | |
|
|
||||
| 2026-01-01 11:00:00 | 2026-01-01 11:04:28 | 4,4794282 | 5,9 m3 | |
|
|
||||
| 2026-01-01 10:14:48 | 2026-01-01 10:17:12 | 2,4086264 | 2,8 m3 | |
|
|
||||
| 2026-01-01 10:07:38 | 2026-01-01 10:12:14 | 4,590863566666667 | 5,9 m3 | |
|
|
||||
| 2026-01-01 10:00:00 | 2026-01-01 10:05:12 | 5,210816633333334 | 6,2 m3 | |
|
|
||||
| 2026-01-01 09:00:00 | 2026-01-01 09:06:55 | 6,916990683333333 | 7,8 m3 | |
|
|
||||
Batch #1
Start Time
2026-01-04 19:00
End Time
2026-01-04 19:05
Durată
5,165711
Production
5,9 m3
Batch #2
Start Time
2026-01-04 18:00
End Time
2026-01-04 18:06
Durată
6,731193149999999
Production
7,8 m3
Batch #3
Start Time
2026-01-04 17:09
End Time
2026-01-04 17:09
Durată
0,6867098833333334
Production
0,8 m3
Batch #4
Start Time
2026-01-04 17:00
End Time
2026-01-04 17:06
Durată
6,914535116666667
Production
7,9 m3
Batch #5
Start Time
2026-01-04 16:06
End Time
2026-01-04 16:09
Durată
3,01028105
Production
3,6 m3
Batch #6
Start Time
2026-01-04 16:00
End Time
2026-01-04 16:04
Durată
4,053762166666667
Production
5,4 m3
Batch #7
Start Time
2026-01-04 15:00
End Time
2026-01-04 15:04
Durată
4,5767953
Production
5,6 m3
Batch #8
Start Time
2026-01-04 14:00
End Time
2026-01-04 14:03
Durată
3,2531799333333336
Production
3,5 m3
Batch #9
Start Time
2026-01-04 13:07
End Time
2026-01-04 13:07
Durată
0,7456203666666668
Production
1,0 m3
Batch #10
Start Time
2026-01-04 13:00
End Time
2026-01-04 13:05
Durată
5,958734166666667
Production
7,2 m3
Batch #11
Start Time
2026-01-04 12:06
End Time
2026-01-04 12:08
Durată
2,006649716666667
Production
2,8 m3
Batch #12
Start Time
2026-01-04 12:00
End Time
2026-01-04 12:05
Durată
5,051171416666667
Production
5,8 m3
Batch #13
Start Time
2026-01-04 11:07
End Time
2026-01-04 11:09
Durată
2,39483445
Production
2,4 m3
Batch #14
Start Time
2026-01-04 11:00
End Time
2026-01-04 11:05
Durată
5,153374583333333
Production
6,6 m3
Batch #15
Start Time
2026-01-04 10:06
End Time
2026-01-04 10:08
Durată
1,6686626833333333
Production
1,9 m3
Batch #16
Start Time
2026-01-04 10:00
End Time
2026-01-04 10:05
Durată
5,054836383333334
Production
5,7 m3
Batch #17
Start Time
2026-01-04 09:00
End Time
2026-01-04 09:03
Durată
3,7459461166666665
Production
4,3 m3
Batch #18
Start Time
2026-01-03 21:00
End Time
2026-01-03 21:00
Durată
0,6389683500000001
Production
1,0 m3
Batch #19
Start Time
2026-01-03 20:00
End Time
2026-01-03 20:02
Durată
2,0351468333333336
Production
2,9 m3
Batch #20
Start Time
2026-01-03 19:00
End Time
2026-01-03 19:03
Durată
3,9438436
Production
4,8 m3
Batch #21
Start Time
2026-01-03 18:00
End Time
2026-01-03 18:05
Durată
5,354351183333334
Production
5,5 m3
Batch #22
Start Time
2026-01-03 17:00
End Time
2026-01-03 17:06
Durată
6,200464766666667
Production
7,2 m3
Batch #23
Start Time
2026-01-03 16:00
End Time
2026-01-03 16:06
Durată
6,076331566666667
Production
7,4 m3
Batch #24
Start Time
2026-01-03 15:00
End Time
2026-01-03 15:03
Durată
3,0938984333333335
Production
3,3 m3
Batch #25
Start Time
2026-01-03 14:00
End Time
2026-01-03 14:02
Durată
2,4788117499999998
Production
2,5 m3
Batch #26
Start Time
2026-01-03 13:06
End Time
2026-01-03 13:07
Durată
0,8809697833333333
Production
1,0 m3
Batch #27
Start Time
2026-01-03 13:00
End Time
2026-01-03 13:04
Durată
4,3466172
Production
5,8 m3
Batch #28
Start Time
2026-01-03 12:00
End Time
2026-01-03 12:06
Durată
6,399318916666667
Production
7,8 m3
Batch #29
Start Time
2026-01-03 11:06
End Time
2026-01-03 11:07
Durată
1,2174607333333334
Production
1,6 m3
Batch #30
Start Time
2026-01-03 11:00
End Time
2026-01-03 11:04
Durată
4,411405149999999
Production
5,0 m3
Batch #31
Start Time
2026-01-03 10:00
End Time
2026-01-03 10:05
Durată
5,2989658833333335
Production
5,7 m3
Batch #32
Start Time
2026-01-03 09:00
End Time
2026-01-03 09:03
Durată
3,3893662166666667
Production
3,4 m3
Batch #33
Start Time
2026-01-02 21:00
End Time
2026-01-02 21:01
Durată
1,9291322499999999
Production
2,0 m3
Batch #34
Start Time
2026-01-02 20:06
End Time
2026-01-02 20:07
Durată
0,7438505333333333
Production
1,0 m3
Batch #35
Start Time
2026-01-02 20:00
End Time
2026-01-02 20:04
Durată
4,5465608
Production
5,2 m3
Batch #36
Start Time
2026-01-02 19:07
End Time
2026-01-02 19:10
Durată
2,8617567833333335
Production
3,1 m3
Batch #37
Start Time
2026-01-02 19:00
End Time
2026-01-02 19:05
Durată
5,99344515
Production
7,1 m3
Batch #38
Start Time
2026-01-02 18:13
End Time
2026-01-02 18:16
Durată
2,30605
Production
2,6 m3
Batch #39
Start Time
2026-01-02 18:07
End Time
2026-01-02 18:12
Durată
4,382588433333334
Production
4,2 m3
Batch #40
Start Time
2026-01-02 18:00
End Time
2026-01-02 18:05
Durată
5,353009283333334
Production
6,0 m3
Batch #41
Start Time
2026-01-02 17:14
End Time
2026-01-02 17:17
Durată
2,9120923
Production
3,6 m3
Batch #42
Start Time
2026-01-02 17:07
End Time
2026-01-02 17:11
Durată
4,331380566666667
Production
5,4 m3
Batch #43
Start Time
2026-01-02 17:00
End Time
2026-01-02 17:05
Durată
5,107388666666667
Production
6,7 m3
Batch #44
Start Time
2026-01-02 16:15
End Time
2026-01-02 16:15
Durată
0,7281757666666666
Production
0,6 m3
Batch #45
Start Time
2026-01-02 16:09
End Time
2026-01-02 16:13
Durată
4,2794722499999995
Production
5,5 m3
Batch #46
Start Time
2026-01-02 16:00
End Time
2026-01-02 16:07
Durată
7,533854116666666
Production
8,9 m3
Batch #47
Start Time
2026-01-02 15:08
End Time
2026-01-02 15:09
Durată
1,3816591833333334
Production
2,0 m3
Batch #48
Start Time
2026-01-02 15:00
End Time
2026-01-02 15:05
Durată
5,988578166666667
Production
7,8 m3
Batch #49
Start Time
2026-01-02 14:00
End Time
2026-01-02 14:05
Durată
5,47752535
Production
5,6 m3
Batch #50
Start Time
2026-01-02 13:08
End Time
2026-01-02 13:13
Durată
5,0161549
Production
6,8 m3
Batch #51
Start Time
2026-01-02 13:00
End Time
2026-01-02 13:06
Durată
6,65524875
Production
8,1 m3
Batch #52
Start Time
2026-01-02 12:08
End Time
2026-01-02 12:14
Durată
6,099318616666666
Production
7,0 m3
Batch #53
Start Time
2026-01-02 12:00
End Time
2026-01-02 12:06
Durată
6,52456015
Production
7,7 m3
Batch #54
Start Time
2026-01-02 11:08
End Time
2026-01-02 11:14
Durată
5,884896566666667
Production
6,7 m3
Batch #55
Start Time
2026-01-02 11:00
End Time
2026-01-02 11:06
Durată
6,541983383333333
Production
7,8 m3
Batch #56
Start Time
2026-01-02 10:13
End Time
2026-01-02 10:14
Durată
0,8974669833333333
Production
1,0 m3
Batch #57
Start Time
2026-01-02 10:06
End Time
2026-01-02 10:12
Durată
6,6632088666666665
Production
7,8 m3
Batch #58
Start Time
2026-01-02 10:00
End Time
2026-01-02 10:04
Durată
4,2474992
Production
5,9 m3
Batch #59
Start Time
2026-01-02 09:06
End Time
2026-01-02 09:07
Durată
0,6152262833333333
Production
1,0 m3
Batch #60
Start Time
2026-01-02 09:00
End Time
2026-01-02 09:05
Durată
5,56986205
Production
6,1 m3
Batch #61
Start Time
2026-01-01 21:00
End Time
2026-01-01 21:01
Durată
1,92678535
Production
2,9 m3
Batch #62
Start Time
2026-01-01 20:06
End Time
2026-01-01 20:07
Durată
0,8857657499999999
Production
1,0 m3
Batch #63
Start Time
2026-01-01 20:00
End Time
2026-01-01 20:04
Durată
4,5166802
Production
5,4 m3
Batch #64
Start Time
2026-01-01 19:09
End Time
2026-01-01 19:10
Durată
1,3673641
Production
1,5 m3
Batch #65
Start Time
2026-01-01 19:00
End Time
2026-01-01 19:06
Durată
6,9695169833333335
Production
9,8 m3
Batch #66
Start Time
2026-01-01 18:08
End Time
2026-01-01 18:14
Durată
5,176301216666667
Production
6,0 m3
Batch #67
Start Time
2026-01-01 18:00
End Time
2026-01-01 18:06
Durată
6,750783966666666
Production
8,6 m3
Batch #68
Start Time
2026-01-01 17:13
End Time
2026-01-01 17:17
Durată
3,8954160333333334
Production
4,5 m3
Batch #69
Start Time
2026-01-01 17:05
End Time
2026-01-01 17:11
Durată
5,483232416666667
Production
6,0 m3
Batch #70
Start Time
2026-01-01 17:00
End Time
2026-01-01 17:04
Durată
4,57195455
Production
5,7 m3
Batch #71
Start Time
2026-01-01 16:15
End Time
2026-01-01 16:16
Durată
0,6334427166666666
Production
1,0 m3
Batch #72
Start Time
2026-01-01 16:07
End Time
2026-01-01 16:14
Durată
6,9877833
Production
8,5 m3
Batch #73
Start Time
2026-01-01 16:00
End Time
2026-01-01 16:05
Durată
5,475782283333333
Production
6,2 m3
Batch #74
Start Time
2026-01-01 15:07
End Time
2026-01-01 15:10
Durată
2,9770997166666664
Production
3,8 m3
Batch #75
Start Time
2026-01-01 15:00
End Time
2026-01-01 15:04
Durată
4,522072966666667
Production
5,3 m3
Batch #76
Start Time
2026-01-01 14:00
End Time
2026-01-01 14:05
Durată
5,095250333333333
Production
6,5 m3
Batch #77
Start Time
2026-01-01 13:08
End Time
2026-01-01 13:14
Durată
6,294517616666667
Production
6,7 m3
Batch #78
Start Time
2026-01-01 13:00
End Time
2026-01-01 13:05
Durată
5,777830716666667
Production
7,5 m3
Batch #79
Start Time
2026-01-01 12:14
End Time
2026-01-01 12:17
Durată
3,0992932166666667
Production
3,2 m3
Batch #80
Start Time
2026-01-01 12:06
End Time
2026-01-01 12:12
Durată
5,646590533333334
Production
7,3 m3
Batch #81
Start Time
2026-01-01 12:00
End Time
2026-01-01 12:04
Durată
4,7527118999999995
Production
5,1 m3
Batch #82
Start Time
2026-01-01 11:16
End Time
2026-01-01 11:19
Durată
3,0002104833333334
Production
3,9 m3
Batch #83
Start Time
2026-01-01 11:07
End Time
2026-01-01 11:13
Durată
5,928326416666667
Production
7,9 m3
Batch #84
Start Time
2026-01-01 11:00
End Time
2026-01-01 11:04
Durată
4,4794282
Production
5,9 m3
Batch #85
Start Time
2026-01-01 10:14
End Time
2026-01-01 10:17
Durată
2,4086264
Production
2,8 m3
Batch #86
Start Time
2026-01-01 10:07
End Time
2026-01-01 10:12
Durată
4,590863566666667
Production
5,9 m3
Batch #87
Start Time
2026-01-01 10:00
End Time
2026-01-01 10:05
Durată
5,210816633333334
Production
6,2 m3
Batch #88
Start Time
2026-01-01 09:00
End Time
2026-01-01 09:06
Durată
6,916990683333333
Production
7,8 m3
Showing 701 to 788 of 788 cycles