Demo Beton Beta - Batches
Concrete Plant
Total Cycles:
792
Production:
6585,6 m3
| Start Time | End Time | Durată | Production | |
|---|---|---|---|---|
| 2026-01-23 19:10:06 | 2026-01-23 19:14:05 | 3,9750518666666665 | 7,0 m3 | |
|
|
||||
| 2026-01-23 19:00:00 | 2026-01-23 19:07:15 | 7,262764016666667 | 13,6 m3 | |
|
|
||||
| 2026-01-23 18:14:56 | 2026-01-23 18:18:39 | 3,718100616666667 | 6,1 m3 | |
|
|
||||
| 2026-01-23 18:07:24 | 2026-01-23 18:12:47 | 5,386117366666666 | 9,2 m3 | |
|
|
||||
| 2026-01-23 18:00:00 | 2026-01-23 18:05:58 | 5,970096683333334 | 11,4 m3 | |
|
|
||||
| 2026-01-23 17:15:49 | 2026-01-23 17:21:01 | 5,203830133333333 | 8,8 m3 | |
|
|
||||
| 2026-01-23 17:08:55 | 2026-01-23 17:13:10 | 4,236381633333333 | 8,2 m3 | |
|
|
||||
| 2026-01-23 17:00:00 | 2026-01-23 17:06:38 | 6,64709795 | 11,6 m3 | |
|
|
||||
| 2026-01-23 16:19:44 | 2026-01-23 16:21:18 | 1,5660385666666667 | 2,9 m3 | |
|
|
||||
| 2026-01-23 16:12:21 | 2026-01-23 16:17:37 | 5,2734793 | 9,2 m3 | |
|
|
||||
| 2026-01-23 16:06:30 | 2026-01-23 16:11:06 | 4,595974433333334 | 8,1 m3 | |
|
|
||||
| 2026-01-23 16:00:00 | 2026-01-23 16:05:08 | 5,143957716666667 | 9,0 m3 | |
|
|
||||
| 2026-01-23 15:07:49 | 2026-01-23 15:11:34 | 3,7391403833333334 | 7,1 m3 | |
|
|
||||
| 2026-01-23 15:00:00 | 2026-01-23 15:05:46 | 5,778535583333333 | 11,1 m3 | |
|
|
||||
| 2026-01-23 14:00:00 | 2026-01-23 14:06:19 | 6,332408 | 10,7 m3 | |
|
|
||||
| 2026-01-23 13:16:46 | 2026-01-23 13:19:41 | 2,912343733333333 | 5,4 m3 | |
|
|
||||
| 2026-01-23 13:07:19 | 2026-01-23 13:15:04 | 7,7399926 | 13,0 m3 | |
|
|
||||
| 2026-01-23 13:00:00 | 2026-01-23 13:04:28 | 4,48117415 | 8,1 m3 | |
|
|
||||
| 2026-01-23 12:15:34 | 2026-01-23 12:20:51 | 5,2808964000000005 | 9,5 m3 | |
|
|
||||
| 2026-01-23 12:06:31 | 2026-01-23 12:12:35 | 6,073046033333333 | 11,7 m3 | |
|
|
||||
| 2026-01-23 12:00:00 | 2026-01-23 12:05:06 | 5,105811016666666 | 9,9 m3 | |
|
|
||||
| 2026-01-23 11:17:54 | 2026-01-23 11:21:54 | 4,0101646833333335 | 7,4 m3 | |
|
|
||||
| 2026-01-23 11:08:08 | 2026-01-23 11:15:26 | 7,303595483333334 | 13,5 m3 | |
|
|
||||
| 2026-01-23 11:00:00 | 2026-01-23 11:05:24 | 5,40087255 | 10,3 m3 | |
|
|
||||
| 2026-01-23 10:15:47 | 2026-01-23 10:18:58 | 3,175480116666667 | 5,6 m3 | |
|
|
||||
| 2026-01-23 10:07:18 | 2026-01-23 10:14:22 | 7,076786633333333 | 13,4 m3 | |
|
|
||||
| 2026-01-23 10:00:00 | 2026-01-23 10:04:20 | 4,335827666666666 | 8,1 m3 | |
|
|
||||
| 2026-01-23 09:06:09 | 2026-01-23 09:09:46 | 3,6237282 | 6,5 m3 | |
|
|
||||
| 2026-01-23 09:00:00 | 2026-01-23 09:04:40 | 4,6666752 | 6,6 m3 | |
|
|
||||
| 2026-01-22 21:00:00 | 2026-01-22 21:02:53 | 2,8859524 | 5,0 m3 | |
|
|
||||
| 2026-01-22 20:00:00 | 2026-01-22 20:06:29 | 6,487009183333333 | 11,0 m3 | |
|
|
||||
| 2026-01-22 19:09:00 | 2026-01-22 19:13:34 | 4,580571816666667 | 8,4 m3 | |
|
|
||||
| 2026-01-22 19:00:00 | 2026-01-22 19:06:02 | 6,0348975 | 10,4 m3 | |
|
|
||||
| 2026-01-22 18:14:11 | 2026-01-22 18:17:18 | 3,1121704166666664 | 5,0 m3 | |
|
|
||||
| 2026-01-22 18:07:41 | 2026-01-22 18:11:47 | 4,113556216666667 | 8,1 m3 | |
|
|
||||
| 2026-01-22 18:00:00 | 2026-01-22 18:06:04 | 6,068516233333333 | 9,2 m3 | |
|
|
||||
| 2026-01-22 17:14:40 | 2026-01-22 17:18:27 | 3,7826598 | 6,7 m3 | |
|
|
||||
| 2026-01-22 17:07:32 | 2026-01-22 17:13:14 | 5,693785016666666 | 10,5 m3 | |
|
|
||||
| 2026-01-22 17:00:00 | 2026-01-22 17:04:55 | 4,928371133333333 | 9,9 m3 | |
|
|
||||
| 2026-01-22 16:18:28 | 2026-01-22 16:20:03 | 1,5852683666666667 | 2,9 m3 | |
|
|
||||
| 2026-01-22 16:08:41 | 2026-01-22 16:16:22 | 7,685472466666667 | 13,4 m3 | |
|
|
||||
| 2026-01-22 16:00:00 | 2026-01-22 16:06:07 | 6,1213574 | 10,3 m3 | |
|
|
||||
| 2026-01-22 15:07:19 | 2026-01-22 15:10:30 | 3,1781711 | 5,3 m3 | |
|
|
||||
| 2026-01-22 15:00:00 | 2026-01-22 15:05:45 | 5,76459195 | 10,5 m3 | |
|
|
||||
| 2026-01-22 14:00:00 | 2026-01-22 14:05:42 | 5,710963033333333 | 10,7 m3 | |
|
|
||||
| 2026-01-22 13:14:31 | 2026-01-22 13:16:44 | 2,2160976666666667 | 4,0 m3 | |
|
|
||||
| 2026-01-22 13:07:23 | 2026-01-22 13:12:30 | 5,118718016666667 | 8,6 m3 | |
|
|
||||
| 2026-01-22 13:00:00 | 2026-01-22 13:06:03 | 6,061199983333334 | 10,7 m3 | |
|
|
||||
| 2026-01-22 12:16:20 | 2026-01-22 12:19:10 | 2,84349465 | 5,8 m3 | |
|
|
||||
| 2026-01-22 12:08:57 | 2026-01-22 12:15:02 | 6,071574433333334 | 10,6 m3 | |
|
|
||||
| 2026-01-22 12:00:00 | 2026-01-22 12:06:05 | 6,098909566666666 | 11,1 m3 | |
|
|
||||
| 2026-01-22 11:16:31 | 2026-01-22 11:18:44 | 2,2250553 | 4,2 m3 | |
|
|
||||
| 2026-01-22 11:07:28 | 2026-01-22 11:14:07 | 6,648283016666666 | 12,3 m3 | |
|
|
||||
| 2026-01-22 11:00:00 | 2026-01-22 11:05:30 | 5,5062473 | 11,5 m3 | |
|
|
||||
| 2026-01-22 10:15:55 | 2026-01-22 10:17:27 | 1,5294421833333334 | 2,9 m3 | |
|
|
||||
| 2026-01-22 10:07:00 | 2026-01-22 10:13:55 | 6,928866983333333 | 12,6 m3 | |
|
|
||||
| 2026-01-22 10:00:00 | 2026-01-22 10:04:49 | 4,8210524333333336 | 8,5 m3 | |
|
|
||||
| 2026-01-22 09:08:01 | 2026-01-22 09:10:12 | 2,1984173166666663 | 4,4 m3 | |
|
|
||||
| 2026-01-22 09:00:00 | 2026-01-22 09:05:05 | 5,0840695333333334 | 9,2 m3 | |
|
|
||||
| 2026-01-21 21:00:00 | 2026-01-21 21:03:01 | 3,0243733666666666 | 5,4 m3 | |
|
|
||||
| 2026-01-21 20:05:45 | 2026-01-21 20:07:16 | 1,5234474 | 3,0 m3 | |
|
|
||||
| 2026-01-21 20:00:00 | 2026-01-21 20:03:51 | 3,8535903166666667 | 8,2 m3 | |
|
|
||||
| 2026-01-21 19:08:01 | 2026-01-21 19:13:22 | 5,357980416666666 | 9,2 m3 | |
|
|
||||
| 2026-01-21 19:00:00 | 2026-01-21 19:05:37 | 5,618362483333333 | 9,3 m3 | |
|
|
||||
| 2026-01-21 18:17:47 | 2026-01-21 18:18:40 | 0,87448195 | 1,4 m3 | |
|
|
||||
| 2026-01-21 18:09:44 | 2026-01-21 18:14:52 | 5,13917685 | 8,4 m3 | |
|
|
||||
| 2026-01-21 18:00:00 | 2026-01-21 18:08:07 | 8,126542816666667 | 13,7 m3 | |
|
|
||||
| 2026-01-21 17:16:06 | 2026-01-21 17:19:08 | 3,0249974666666666 | 4,6 m3 | |
|
|
||||
| 2026-01-21 17:09:18 | 2026-01-21 17:14:40 | 5,381148516666667 | 9,6 m3 | |
|
|
||||
| 2026-01-21 17:00:00 | 2026-01-21 17:06:22 | 6,368266283333333 | 12,4 m3 | |
|
|
||||
| 2026-01-21 16:17:06 | 2026-01-21 16:19:24 | 2,300976233333333 | 3,7 m3 | |
|
|
||||
| 2026-01-21 16:10:08 | 2026-01-21 16:15:36 | 5,462758133333334 | 10,4 m3 | |
|
|
||||
| 2026-01-21 16:00:00 | 2026-01-21 16:07:14 | 7,245063166666667 | 12,6 m3 | |
|
|
||||
| 2026-01-21 15:06:54 | 2026-01-21 15:10:24 | 3,49299765 | 7,2 m3 | |
|
|
||||
| 2026-01-21 15:00:00 | 2026-01-21 15:05:19 | 5,326104816666667 | 8,2 m3 | |
|
|
||||
| 2026-01-21 14:00:00 | 2026-01-21 14:05:49 | 5,830185733333334 | 10,3 m3 | |
|
|
||||
| 2026-01-21 13:15:43 | 2026-01-21 13:17:53 | 2,1748441833333336 | 4,4 m3 | |
|
|
||||
| 2026-01-21 13:09:10 | 2026-01-21 13:14:30 | 5,317556066666667 | 9,2 m3 | |
|
|
||||
| 2026-01-21 13:00:00 | 2026-01-21 13:06:12 | 6,215797566666667 | 11,2 m3 | |
|
|
||||
| 2026-01-21 12:16:06 | 2026-01-21 12:19:45 | 3,654514816666667 | 6,5 m3 | |
|
|
||||
| 2026-01-21 12:06:56 | 2026-01-21 12:13:46 | 6,825581833333334 | 11,9 m3 | |
|
|
||||
| 2026-01-21 12:00:00 | 2026-01-21 12:04:24 | 4,407957183333334 | 7,7 m3 | |
|
|
||||
| 2026-01-21 11:17:04 | 2026-01-21 11:19:59 | 2,9111903 | 5,7 m3 | |
|
|
||||
| 2026-01-21 11:08:32 | 2026-01-21 11:14:39 | 6,1222491833333335 | 11,8 m3 | |
|
|
||||
| 2026-01-21 11:00:00 | 2026-01-21 11:06:02 | 6,042677783333334 | 11,7 m3 | |
|
|
||||
| 2026-01-21 10:15:57 | 2026-01-21 10:18:11 | 2,228719 | 4,4 m3 | |
|
|
||||
| 2026-01-21 10:06:43 | 2026-01-21 10:13:30 | 6,793269983333333 | 10,8 m3 | |
|
|
||||
| 2026-01-21 10:00:00 | 2026-01-21 10:05:11 | 5,188568766666666 | 10,0 m3 | |
|
|
||||
| 2026-01-21 09:07:16 | 2026-01-21 09:10:35 | 3,3299716833333335 | 5,3 m3 | |
|
|
||||
| 2026-01-21 09:00:00 | 2026-01-21 09:04:23 | 4,385566266666667 | 8,3 m3 | |
|
|
||||
| 2026-01-20 21:00:00 | 2026-01-20 21:02:18 | 2,3154296833333334 | 4,2 m3 | |
|
|
||||
| 2026-01-20 20:00:00 | 2026-01-20 20:05:45 | 5,754509966666666 | 9,2 m3 | |
|
|
||||
| 2026-01-20 19:08:13 | 2026-01-20 19:10:45 | 2,534356416666667 | 4,4 m3 | |
|
|
||||
| 2026-01-20 19:00:00 | 2026-01-20 19:06:54 | 6,90800525 | 11,7 m3 | |
|
|
||||
| 2026-01-20 18:08:34 | 2026-01-20 18:14:44 | 6,161371283333334 | 11,1 m3 | |
|
|
||||
| 2026-01-20 18:00:00 | 2026-01-20 18:05:55 | 5,932478483333333 | 10,8 m3 | |
|
|
||||
| 2026-01-20 17:12:35 | 2026-01-20 17:16:31 | 3,9361632166666665 | 7,1 m3 | |
|
|
||||
| 2026-01-20 17:06:48 | 2026-01-20 17:10:58 | 4,1583513000000005 | 8,2 m3 | |
|
|
||||
| 2026-01-20 17:00:00 | 2026-01-20 17:05:10 | 5,180793566666667 | 10,3 m3 | |
|
|
||||
| 2026-01-20 16:14:25 | 2026-01-20 16:17:21 | 2,9449564666666666 | 5,7 m3 | |
|
|
||||
Batch #1
Start Time
2026-01-23 19:10
End Time
2026-01-23 19:14
Durată
3,9750518666666665
Production
7,0 m3
Batch #2
Start Time
2026-01-23 19:00
End Time
2026-01-23 19:07
Durată
7,262764016666667
Production
13,6 m3
Batch #3
Start Time
2026-01-23 18:14
End Time
2026-01-23 18:18
Durată
3,718100616666667
Production
6,1 m3
Batch #4
Start Time
2026-01-23 18:07
End Time
2026-01-23 18:12
Durată
5,386117366666666
Production
9,2 m3
Batch #5
Start Time
2026-01-23 18:00
End Time
2026-01-23 18:05
Durată
5,970096683333334
Production
11,4 m3
Batch #6
Start Time
2026-01-23 17:15
End Time
2026-01-23 17:21
Durată
5,203830133333333
Production
8,8 m3
Batch #7
Start Time
2026-01-23 17:08
End Time
2026-01-23 17:13
Durată
4,236381633333333
Production
8,2 m3
Batch #8
Start Time
2026-01-23 17:00
End Time
2026-01-23 17:06
Durată
6,64709795
Production
11,6 m3
Batch #9
Start Time
2026-01-23 16:19
End Time
2026-01-23 16:21
Durată
1,5660385666666667
Production
2,9 m3
Batch #10
Start Time
2026-01-23 16:12
End Time
2026-01-23 16:17
Durată
5,2734793
Production
9,2 m3
Batch #11
Start Time
2026-01-23 16:06
End Time
2026-01-23 16:11
Durată
4,595974433333334
Production
8,1 m3
Batch #12
Start Time
2026-01-23 16:00
End Time
2026-01-23 16:05
Durată
5,143957716666667
Production
9,0 m3
Batch #13
Start Time
2026-01-23 15:07
End Time
2026-01-23 15:11
Durată
3,7391403833333334
Production
7,1 m3
Batch #14
Start Time
2026-01-23 15:00
End Time
2026-01-23 15:05
Durată
5,778535583333333
Production
11,1 m3
Batch #15
Start Time
2026-01-23 14:00
End Time
2026-01-23 14:06
Durată
6,332408
Production
10,7 m3
Batch #16
Start Time
2026-01-23 13:16
End Time
2026-01-23 13:19
Durată
2,912343733333333
Production
5,4 m3
Batch #17
Start Time
2026-01-23 13:07
End Time
2026-01-23 13:15
Durată
7,7399926
Production
13,0 m3
Batch #18
Start Time
2026-01-23 13:00
End Time
2026-01-23 13:04
Durată
4,48117415
Production
8,1 m3
Batch #19
Start Time
2026-01-23 12:15
End Time
2026-01-23 12:20
Durată
5,2808964000000005
Production
9,5 m3
Batch #20
Start Time
2026-01-23 12:06
End Time
2026-01-23 12:12
Durată
6,073046033333333
Production
11,7 m3
Batch #21
Start Time
2026-01-23 12:00
End Time
2026-01-23 12:05
Durată
5,105811016666666
Production
9,9 m3
Batch #22
Start Time
2026-01-23 11:17
End Time
2026-01-23 11:21
Durată
4,0101646833333335
Production
7,4 m3
Batch #23
Start Time
2026-01-23 11:08
End Time
2026-01-23 11:15
Durată
7,303595483333334
Production
13,5 m3
Batch #24
Start Time
2026-01-23 11:00
End Time
2026-01-23 11:05
Durată
5,40087255
Production
10,3 m3
Batch #25
Start Time
2026-01-23 10:15
End Time
2026-01-23 10:18
Durată
3,175480116666667
Production
5,6 m3
Batch #26
Start Time
2026-01-23 10:07
End Time
2026-01-23 10:14
Durată
7,076786633333333
Production
13,4 m3
Batch #27
Start Time
2026-01-23 10:00
End Time
2026-01-23 10:04
Durată
4,335827666666666
Production
8,1 m3
Batch #28
Start Time
2026-01-23 09:06
End Time
2026-01-23 09:09
Durată
3,6237282
Production
6,5 m3
Batch #29
Start Time
2026-01-23 09:00
End Time
2026-01-23 09:04
Durată
4,6666752
Production
6,6 m3
Batch #30
Start Time
2026-01-22 21:00
End Time
2026-01-22 21:02
Durată
2,8859524
Production
5,0 m3
Batch #31
Start Time
2026-01-22 20:00
End Time
2026-01-22 20:06
Durată
6,487009183333333
Production
11,0 m3
Batch #32
Start Time
2026-01-22 19:09
End Time
2026-01-22 19:13
Durată
4,580571816666667
Production
8,4 m3
Batch #33
Start Time
2026-01-22 19:00
End Time
2026-01-22 19:06
Durată
6,0348975
Production
10,4 m3
Batch #34
Start Time
2026-01-22 18:14
End Time
2026-01-22 18:17
Durată
3,1121704166666664
Production
5,0 m3
Batch #35
Start Time
2026-01-22 18:07
End Time
2026-01-22 18:11
Durată
4,113556216666667
Production
8,1 m3
Batch #36
Start Time
2026-01-22 18:00
End Time
2026-01-22 18:06
Durată
6,068516233333333
Production
9,2 m3
Batch #37
Start Time
2026-01-22 17:14
End Time
2026-01-22 17:18
Durată
3,7826598
Production
6,7 m3
Batch #38
Start Time
2026-01-22 17:07
End Time
2026-01-22 17:13
Durată
5,693785016666666
Production
10,5 m3
Batch #39
Start Time
2026-01-22 17:00
End Time
2026-01-22 17:04
Durată
4,928371133333333
Production
9,9 m3
Batch #40
Start Time
2026-01-22 16:18
End Time
2026-01-22 16:20
Durată
1,5852683666666667
Production
2,9 m3
Batch #41
Start Time
2026-01-22 16:08
End Time
2026-01-22 16:16
Durată
7,685472466666667
Production
13,4 m3
Batch #42
Start Time
2026-01-22 16:00
End Time
2026-01-22 16:06
Durată
6,1213574
Production
10,3 m3
Batch #43
Start Time
2026-01-22 15:07
End Time
2026-01-22 15:10
Durată
3,1781711
Production
5,3 m3
Batch #44
Start Time
2026-01-22 15:00
End Time
2026-01-22 15:05
Durată
5,76459195
Production
10,5 m3
Batch #45
Start Time
2026-01-22 14:00
End Time
2026-01-22 14:05
Durată
5,710963033333333
Production
10,7 m3
Batch #46
Start Time
2026-01-22 13:14
End Time
2026-01-22 13:16
Durată
2,2160976666666667
Production
4,0 m3
Batch #47
Start Time
2026-01-22 13:07
End Time
2026-01-22 13:12
Durată
5,118718016666667
Production
8,6 m3
Batch #48
Start Time
2026-01-22 13:00
End Time
2026-01-22 13:06
Durată
6,061199983333334
Production
10,7 m3
Batch #49
Start Time
2026-01-22 12:16
End Time
2026-01-22 12:19
Durată
2,84349465
Production
5,8 m3
Batch #50
Start Time
2026-01-22 12:08
End Time
2026-01-22 12:15
Durată
6,071574433333334
Production
10,6 m3
Batch #51
Start Time
2026-01-22 12:00
End Time
2026-01-22 12:06
Durată
6,098909566666666
Production
11,1 m3
Batch #52
Start Time
2026-01-22 11:16
End Time
2026-01-22 11:18
Durată
2,2250553
Production
4,2 m3
Batch #53
Start Time
2026-01-22 11:07
End Time
2026-01-22 11:14
Durată
6,648283016666666
Production
12,3 m3
Batch #54
Start Time
2026-01-22 11:00
End Time
2026-01-22 11:05
Durată
5,5062473
Production
11,5 m3
Batch #55
Start Time
2026-01-22 10:15
End Time
2026-01-22 10:17
Durată
1,5294421833333334
Production
2,9 m3
Batch #56
Start Time
2026-01-22 10:07
End Time
2026-01-22 10:13
Durată
6,928866983333333
Production
12,6 m3
Batch #57
Start Time
2026-01-22 10:00
End Time
2026-01-22 10:04
Durată
4,8210524333333336
Production
8,5 m3
Batch #58
Start Time
2026-01-22 09:08
End Time
2026-01-22 09:10
Durată
2,1984173166666663
Production
4,4 m3
Batch #59
Start Time
2026-01-22 09:00
End Time
2026-01-22 09:05
Durată
5,0840695333333334
Production
9,2 m3
Batch #60
Start Time
2026-01-21 21:00
End Time
2026-01-21 21:03
Durată
3,0243733666666666
Production
5,4 m3
Batch #61
Start Time
2026-01-21 20:05
End Time
2026-01-21 20:07
Durată
1,5234474
Production
3,0 m3
Batch #62
Start Time
2026-01-21 20:00
End Time
2026-01-21 20:03
Durată
3,8535903166666667
Production
8,2 m3
Batch #63
Start Time
2026-01-21 19:08
End Time
2026-01-21 19:13
Durată
5,357980416666666
Production
9,2 m3
Batch #64
Start Time
2026-01-21 19:00
End Time
2026-01-21 19:05
Durată
5,618362483333333
Production
9,3 m3
Batch #65
Start Time
2026-01-21 18:17
End Time
2026-01-21 18:18
Durată
0,87448195
Production
1,4 m3
Batch #66
Start Time
2026-01-21 18:09
End Time
2026-01-21 18:14
Durată
5,13917685
Production
8,4 m3
Batch #67
Start Time
2026-01-21 18:00
End Time
2026-01-21 18:08
Durată
8,126542816666667
Production
13,7 m3
Batch #68
Start Time
2026-01-21 17:16
End Time
2026-01-21 17:19
Durată
3,0249974666666666
Production
4,6 m3
Batch #69
Start Time
2026-01-21 17:09
End Time
2026-01-21 17:14
Durată
5,381148516666667
Production
9,6 m3
Batch #70
Start Time
2026-01-21 17:00
End Time
2026-01-21 17:06
Durată
6,368266283333333
Production
12,4 m3
Batch #71
Start Time
2026-01-21 16:17
End Time
2026-01-21 16:19
Durată
2,300976233333333
Production
3,7 m3
Batch #72
Start Time
2026-01-21 16:10
End Time
2026-01-21 16:15
Durată
5,462758133333334
Production
10,4 m3
Batch #73
Start Time
2026-01-21 16:00
End Time
2026-01-21 16:07
Durată
7,245063166666667
Production
12,6 m3
Batch #74
Start Time
2026-01-21 15:06
End Time
2026-01-21 15:10
Durată
3,49299765
Production
7,2 m3
Batch #75
Start Time
2026-01-21 15:00
End Time
2026-01-21 15:05
Durată
5,326104816666667
Production
8,2 m3
Batch #76
Start Time
2026-01-21 14:00
End Time
2026-01-21 14:05
Durată
5,830185733333334
Production
10,3 m3
Batch #77
Start Time
2026-01-21 13:15
End Time
2026-01-21 13:17
Durată
2,1748441833333336
Production
4,4 m3
Batch #78
Start Time
2026-01-21 13:09
End Time
2026-01-21 13:14
Durată
5,317556066666667
Production
9,2 m3
Batch #79
Start Time
2026-01-21 13:00
End Time
2026-01-21 13:06
Durată
6,215797566666667
Production
11,2 m3
Batch #80
Start Time
2026-01-21 12:16
End Time
2026-01-21 12:19
Durată
3,654514816666667
Production
6,5 m3
Batch #81
Start Time
2026-01-21 12:06
End Time
2026-01-21 12:13
Durată
6,825581833333334
Production
11,9 m3
Batch #82
Start Time
2026-01-21 12:00
End Time
2026-01-21 12:04
Durată
4,407957183333334
Production
7,7 m3
Batch #83
Start Time
2026-01-21 11:17
End Time
2026-01-21 11:19
Durată
2,9111903
Production
5,7 m3
Batch #84
Start Time
2026-01-21 11:08
End Time
2026-01-21 11:14
Durată
6,1222491833333335
Production
11,8 m3
Batch #85
Start Time
2026-01-21 11:00
End Time
2026-01-21 11:06
Durată
6,042677783333334
Production
11,7 m3
Batch #86
Start Time
2026-01-21 10:15
End Time
2026-01-21 10:18
Durată
2,228719
Production
4,4 m3
Batch #87
Start Time
2026-01-21 10:06
End Time
2026-01-21 10:13
Durată
6,793269983333333
Production
10,8 m3
Batch #88
Start Time
2026-01-21 10:00
End Time
2026-01-21 10:05
Durată
5,188568766666666
Production
10,0 m3
Batch #89
Start Time
2026-01-21 09:07
End Time
2026-01-21 09:10
Durată
3,3299716833333335
Production
5,3 m3
Batch #90
Start Time
2026-01-21 09:00
End Time
2026-01-21 09:04
Durată
4,385566266666667
Production
8,3 m3
Batch #91
Start Time
2026-01-20 21:00
End Time
2026-01-20 21:02
Durată
2,3154296833333334
Production
4,2 m3
Batch #92
Start Time
2026-01-20 20:00
End Time
2026-01-20 20:05
Durată
5,754509966666666
Production
9,2 m3
Batch #93
Start Time
2026-01-20 19:08
End Time
2026-01-20 19:10
Durată
2,534356416666667
Production
4,4 m3
Batch #94
Start Time
2026-01-20 19:00
End Time
2026-01-20 19:06
Durată
6,90800525
Production
11,7 m3
Batch #95
Start Time
2026-01-20 18:08
End Time
2026-01-20 18:14
Durată
6,161371283333334
Production
11,1 m3
Batch #96
Start Time
2026-01-20 18:00
End Time
2026-01-20 18:05
Durată
5,932478483333333
Production
10,8 m3
Batch #97
Start Time
2026-01-20 17:12
End Time
2026-01-20 17:16
Durată
3,9361632166666665
Production
7,1 m3
Batch #98
Start Time
2026-01-20 17:06
End Time
2026-01-20 17:10
Durată
4,1583513000000005
Production
8,2 m3
Batch #99
Start Time
2026-01-20 17:00
End Time
2026-01-20 17:05
Durată
5,180793566666667
Production
10,3 m3
Batch #100
Start Time
2026-01-20 16:14
End Time
2026-01-20 16:17
Durată
2,9449564666666666
Production
5,7 m3