Demo Beton Beta - Batches
Concrete Plant
Total Cycles:
787
Production:
6545,0 m3
Showing 1 to 100 of 787 cycles
| Start Time | End Time | Durată | Production | |
|---|---|---|---|---|
| 2026-01-29 19:24:17 | 2026-01-29 19:30:09 | 5,86154625 | 8,0 m3 | |
|
|
||||
| 2026-01-29 19:16:10 | 2026-01-29 19:22:20 | 6,166346566666666 | 10,1 m3 | |
|
|
||||
| 2026-01-29 19:07:22 | 2026-01-29 19:14:41 | 7,326007966666666 | 13,5 m3 | |
|
|
||||
| 2026-01-29 19:00:00 | 2026-01-29 19:06:11 | 6,19010155 | 10,5 m3 | |
|
|
||||
| 2026-01-29 18:35:32 | 2026-01-29 18:38:38 | 3,098749583333333 | 5,9 m3 | |
|
|
||||
| 2026-01-29 18:25:21 | 2026-01-29 18:32:45 | 7,388078016666666 | 13,5 m3 | |
|
|
||||
| 2026-01-29 18:17:57 | 2026-01-29 18:24:12 | 6,25792505 | 11,9 m3 | |
|
|
||||
| 2026-01-29 18:09:14 | 2026-01-29 18:16:13 | 6,974480183333333 | 10,9 m3 | |
|
|
||||
| 2026-01-29 18:00:00 | 2026-01-29 18:07:45 | 7,764607216666667 | 14,0 m3 | |
|
|
||||
| 2026-01-29 17:56:22 | 2026-01-29 17:57:15 | 0,8785025166666667 | 1,5 m3 | |
|
|
||||
| 2026-01-29 17:47:52 | 2026-01-29 17:53:51 | 5,982566516666666 | 10,6 m3 | |
|
|
||||
| 2026-01-29 17:40:45 | 2026-01-29 17:46:51 | 6,098227466666667 | 10,8 m3 | |
|
|
||||
| 2026-01-29 17:33:26 | 2026-01-29 17:37:58 | 4,539153266666667 | 8,7 m3 | |
|
|
||||
| 2026-01-29 17:24:23 | 2026-01-29 17:30:57 | 6,562864083333333 | 11,8 m3 | |
|
|
||||
| 2026-01-29 17:16:30 | 2026-01-29 17:21:44 | 5,232757783333333 | 8,9 m3 | |
|
|
||||
| 2026-01-29 17:06:11 | 2026-01-29 17:13:49 | 7,633363083333333 | 13,5 m3 | |
|
|
||||
| 2026-01-29 17:00:00 | 2026-01-29 17:04:06 | 4,106275683333333 | 8,5 m3 | |
|
|
||||
| 2026-01-29 16:47:37 | 2026-01-29 16:51:44 | 4,11936285 | 6,5 m3 | |
|
|
||||
| 2026-01-29 16:40:23 | 2026-01-29 16:44:58 | 4,5821125333333335 | 8,8 m3 | |
|
|
||||
| 2026-01-29 16:32:49 | 2026-01-29 16:37:31 | 4,700774816666667 | 8,1 m3 | |
|
|
||||
| 2026-01-29 16:23:02 | 2026-01-29 16:29:53 | 6,8500055500000006 | 12,2 m3 | |
|
|
||||
| 2026-01-29 16:13:39 | 2026-01-29 16:21:00 | 7,354142183333334 | 11,8 m3 | |
|
|
||||
| 2026-01-29 16:08:10 | 2026-01-29 16:12:35 | 4,414050216666666 | 8,0 m3 | |
|
|
||||
| 2026-01-29 16:00:00 | 2026-01-29 16:06:11 | 6,1952124 | 11,1 m3 | |
|
|
||||
| 2026-01-29 15:31:37 | 2026-01-29 15:35:23 | 3,780994616666667 | 6,4 m3 | |
|
|
||||
| 2026-01-29 15:25:49 | 2026-01-29 15:30:17 | 4,459826566666666 | 8,5 m3 | |
|
|
||||
| 2026-01-29 15:23:57 | 2026-01-29 15:28:33 | 4,6102726333333335 | 7,6 m3 | |
|
|
||||
| 2026-01-29 15:17:41 | 2026-01-29 15:22:59 | 5,300309516666667 | 10,0 m3 | |
|
|
||||
| 2026-01-29 15:16:16 | 2026-01-29 15:22:44 | 6,466147483333333 | 11,3 m3 | |
|
|
||||
| 2026-01-29 15:07:48 | 2026-01-29 15:15:29 | 7,675835216666667 | 13,2 m3 | |
|
|
||||
| 2026-01-29 15:06:49 | 2026-01-29 15:13:32 | 6,7027149 | 12,6 m3 | |
|
|
||||
| 2026-01-29 15:00:00 | 2026-01-29 15:04:24 | 4,416355333333333 | 8,7 m3 | |
|
|
||||
| 2026-01-29 15:00:00 | 2026-01-29 15:05:15 | 5,266003833333333 | 9,4 m3 | |
|
|
||||
| 2026-01-29 14:09:51 | 2026-01-29 14:15:35 | 5,7298598 | 10,4 m3 | |
|
|
||||
| 2026-01-29 14:00:00 | 2026-01-29 14:06:54 | 6,914769733333333 | 13,8 m3 | |
|
|
||||
| 2026-01-29 13:45:28 | 2026-01-29 13:49:02 | 3,5734494666666667 | 6,2 m3 | |
|
|
||||
| 2026-01-29 13:36:28 | 2026-01-29 13:44:20 | 7,859371116666667 | 13,8 m3 | |
|
|
||||
| 2026-01-29 13:29:48 | 2026-01-29 13:34:25 | 4,62327775 | 7,9 m3 | |
|
|
||||
| 2026-01-29 13:20:35 | 2026-01-29 13:27:27 | 6,8695022 | 11,9 m3 | |
|
|
||||
| 2026-01-29 13:11:35 | 2026-01-29 13:19:25 | 7,826601766666667 | 12,7 m3 | |
|
|
||||
| 2026-01-29 13:06:05 | 2026-01-29 13:10:20 | 4,250898566666667 | 8,8 m3 | |
|
|
||||
| 2026-01-29 13:00:00 | 2026-01-29 13:04:59 | 4,994819833333334 | 8,6 m3 | |
|
|
||||
| 2026-01-29 12:47:28 | 2026-01-29 12:52:24 | 4,924837116666667 | 9,7 m3 | |
|
|
||||
| 2026-01-29 12:39:18 | 2026-01-29 12:45:29 | 6,1845688333333335 | 10,5 m3 | |
|
|
||||
| 2026-01-29 12:33:23 | 2026-01-29 12:38:08 | 4,7570699 | 7,9 m3 | |
|
|
||||
| 2026-01-29 12:25:10 | 2026-01-29 12:30:41 | 5,512631150000001 | 9,5 m3 | |
|
|
||||
| 2026-01-29 12:14:59 | 2026-01-29 12:22:34 | 7,588272566666666 | 13,5 m3 | |
|
|
||||
| 2026-01-29 12:08:24 | 2026-01-29 12:13:32 | 5,128066416666667 | 9,5 m3 | |
|
|
||||
| 2026-01-29 12:00:00 | 2026-01-29 12:06:27 | 6,459727616666667 | 12,7 m3 | |
|
|
||||
| 2026-01-29 11:53:02 | 2026-01-29 11:53:42 | 0,6739554833333333 | 1,5 m3 | |
|
|
||||
| 2026-01-29 11:47:35 | 2026-01-29 11:51:38 | 4,0418522999999995 | 7,8 m3 | |
|
|
||||
| 2026-01-29 11:38:42 | 2026-01-29 11:46:12 | 7,50215925 | 12,0 m3 | |
|
|
||||
| 2026-01-29 11:30:11 | 2026-01-29 11:36:06 | 5,9198535 | 11,2 m3 | |
|
|
||||
| 2026-01-29 11:24:50 | 2026-01-29 11:29:10 | 4,33667935 | 8,3 m3 | |
|
|
||||
| 2026-01-29 11:17:18 | 2026-01-29 11:22:10 | 4,859206299999999 | 9,5 m3 | |
|
|
||||
| 2026-01-29 11:09:16 | 2026-01-29 11:15:36 | 6,339589933333333 | 10,9 m3 | |
|
|
||||
| 2026-01-29 11:00:00 | 2026-01-29 11:07:06 | 7,101515116666667 | 12,3 m3 | |
|
|
||||
| 2026-01-29 10:39:12 | 2026-01-29 10:42:25 | 3,2247359500000004 | 5,7 m3 | |
|
|
||||
| 2026-01-29 10:30:39 | 2026-01-29 10:37:11 | 6,529104983333334 | 12,6 m3 | |
|
|
||||
| 2026-01-29 10:21:06 | 2026-01-29 10:28:53 | 7,7787639833333335 | 14,3 m3 | |
|
|
||||
| 2026-01-29 10:14:18 | 2026-01-29 10:19:32 | 5,231751933333333 | 9,9 m3 | |
|
|
||||
| 2026-01-29 10:06:41 | 2026-01-29 10:12:30 | 5,821032400000001 | 10,0 m3 | |
|
|
||||
| 2026-01-29 10:00:00 | 2026-01-29 10:05:37 | 5,625975733333333 | 9,3 m3 | |
|
|
||||
| 2026-01-29 09:15:08 | 2026-01-29 09:21:28 | 6,3253359499999995 | 10,7 m3 | |
|
|
||||
| 2026-01-29 09:08:18 | 2026-01-29 09:13:41 | 5,381228566666667 | 8,1 m3 | |
|
|
||||
| 2026-01-29 09:00:00 | 2026-01-29 09:06:13 | 6,232435783333333 | 11,3 m3 | |
|
|
||||
| 2026-01-28 21:00:00 | 2026-01-28 21:02:16 | 2,2807901333333334 | 4,4 m3 | |
|
|
||||
| 2026-01-28 20:00:00 | 2026-01-28 20:05:36 | 5,613262716666667 | 9,9 m3 | |
|
|
||||
| 2026-01-28 19:07:56 | 2026-01-28 19:11:08 | 3,2089157166666666 | 4,4 m3 | |
|
|
||||
| 2026-01-28 19:00:00 | 2026-01-28 19:05:58 | 5,969610149999999 | 9,1 m3 | |
|
|
||||
| 2026-01-28 18:08:56 | 2026-01-28 18:14:39 | 5,709355566666667 | 9,1 m3 | |
|
|
||||
| 2026-01-28 18:00:00 | 2026-01-28 18:06:46 | 6,776971133333333 | 12,5 m3 | |
|
|
||||
| 2026-01-28 17:14:46 | 2026-01-28 17:17:47 | 3,0220502166666665 | 5,4 m3 | |
|
|
||||
| 2026-01-28 17:07:57 | 2026-01-28 17:12:48 | 4,8483339 | 8,8 m3 | |
|
|
||||
| 2026-01-28 17:00:00 | 2026-01-28 17:04:58 | 4,970817616666666 | 10,3 m3 | |
|
|
||||
| 2026-01-28 16:14:25 | 2026-01-28 16:17:29 | 3,06167995 | 5,5 m3 | |
|
|
||||
| 2026-01-28 16:07:21 | 2026-01-28 16:12:33 | 5,197467616666667 | 9,4 m3 | |
|
|
||||
| 2026-01-28 16:00:00 | 2026-01-28 16:05:00 | 5,009327366666667 | 10,1 m3 | |
|
|
||||
| 2026-01-28 15:06:28 | 2026-01-28 15:09:56 | 3,4587777333333336 | 5,5 m3 | |
|
|
||||
| 2026-01-28 15:00:00 | 2026-01-28 15:04:52 | 4,882331883333333 | 9,9 m3 | |
|
|
||||
| 2026-01-28 14:00:00 | 2026-01-28 14:04:58 | 4,97670655 | 9,1 m3 | |
|
|
||||
| 2026-01-28 13:14:08 | 2026-01-28 13:15:42 | 1,5735728999999998 | 2,9 m3 | |
|
|
||||
| 2026-01-28 13:08:01 | 2026-01-28 13:12:50 | 4,807311216666666 | 8,5 m3 | |
|
|
||||
| 2026-01-28 13:00:00 | 2026-01-28 13:05:43 | 5,732097483333334 | 9,6 m3 | |
|
|
||||
| 2026-01-28 12:16:37 | 2026-01-28 12:18:02 | 1,4100689 | 2,6 m3 | |
|
|
||||
| 2026-01-28 12:08:58 | 2026-01-28 12:14:40 | 5,703142150000001 | 8,9 m3 | |
|
|
||||
| 2026-01-28 12:00:00 | 2026-01-28 12:06:13 | 6,2238187 | 10,4 m3 | |
|
|
||||
| 2026-01-28 11:15:14 | 2026-01-28 11:17:56 | 2,69217975 | 5,1 m3 | |
|
|
||||
| 2026-01-28 11:07:04 | 2026-01-28 11:12:42 | 5,62981705 | 9,7 m3 | |
|
|
||||
| 2026-01-28 11:00:00 | 2026-01-28 11:05:15 | 5,265689083333333 | 9,7 m3 | |
|
|
||||
| 2026-01-28 10:13:15 | 2026-01-28 10:16:06 | 2,8494533833333335 | 5,3 m3 | |
|
|
||||
| 2026-01-28 10:06:21 | 2026-01-28 10:10:49 | 4,465475333333333 | 7,0 m3 | |
|
|
||||
| 2026-01-28 10:00:00 | 2026-01-28 10:04:08 | 4,142431866666667 | 8,5 m3 | |
|
|
||||
| 2026-01-28 09:05:59 | 2026-01-28 09:08:12 | 2,2174728666666668 | 3,9 m3 | |
|
|
||||
| 2026-01-28 09:00:00 | 2026-01-28 09:04:41 | 4,69913455 | 7,7 m3 | |
|
|
||||
| 2026-01-27 21:00:00 | 2026-01-27 21:02:26 | 2,4364790166666666 | 3,4 m3 | |
|
|
||||
| 2026-01-27 20:00:00 | 2026-01-27 20:05:39 | 5,662198883333334 | 9,5 m3 | |
|
|
||||
| 2026-01-27 19:09:39 | 2026-01-27 19:11:53 | 2,24101195 | 4,4 m3 | |
|
|
||||
| 2026-01-27 19:00:00 | 2026-01-27 19:07:06 | 7,1073066166666665 | 12,5 m3 | |
|
|
||||
| 2026-01-27 18:12:15 | 2026-01-27 18:15:49 | 3,5648782166666666 | 7,1 m3 | |
|
|
||||
Batch #1
Start Time
2026-01-29 19:24
End Time
2026-01-29 19:30
Durată
5,86154625
Production
8,0 m3
Batch #2
Start Time
2026-01-29 19:16
End Time
2026-01-29 19:22
Durată
6,166346566666666
Production
10,1 m3
Batch #3
Start Time
2026-01-29 19:07
End Time
2026-01-29 19:14
Durată
7,326007966666666
Production
13,5 m3
Batch #4
Start Time
2026-01-29 19:00
End Time
2026-01-29 19:06
Durată
6,19010155
Production
10,5 m3
Batch #5
Start Time
2026-01-29 18:35
End Time
2026-01-29 18:38
Durată
3,098749583333333
Production
5,9 m3
Batch #6
Start Time
2026-01-29 18:25
End Time
2026-01-29 18:32
Durată
7,388078016666666
Production
13,5 m3
Batch #7
Start Time
2026-01-29 18:17
End Time
2026-01-29 18:24
Durată
6,25792505
Production
11,9 m3
Batch #8
Start Time
2026-01-29 18:09
End Time
2026-01-29 18:16
Durată
6,974480183333333
Production
10,9 m3
Batch #9
Start Time
2026-01-29 18:00
End Time
2026-01-29 18:07
Durată
7,764607216666667
Production
14,0 m3
Batch #10
Start Time
2026-01-29 17:56
End Time
2026-01-29 17:57
Durată
0,8785025166666667
Production
1,5 m3
Batch #11
Start Time
2026-01-29 17:47
End Time
2026-01-29 17:53
Durată
5,982566516666666
Production
10,6 m3
Batch #12
Start Time
2026-01-29 17:40
End Time
2026-01-29 17:46
Durată
6,098227466666667
Production
10,8 m3
Batch #13
Start Time
2026-01-29 17:33
End Time
2026-01-29 17:37
Durată
4,539153266666667
Production
8,7 m3
Batch #14
Start Time
2026-01-29 17:24
End Time
2026-01-29 17:30
Durată
6,562864083333333
Production
11,8 m3
Batch #15
Start Time
2026-01-29 17:16
End Time
2026-01-29 17:21
Durată
5,232757783333333
Production
8,9 m3
Batch #16
Start Time
2026-01-29 17:06
End Time
2026-01-29 17:13
Durată
7,633363083333333
Production
13,5 m3
Batch #17
Start Time
2026-01-29 17:00
End Time
2026-01-29 17:04
Durată
4,106275683333333
Production
8,5 m3
Batch #18
Start Time
2026-01-29 16:47
End Time
2026-01-29 16:51
Durată
4,11936285
Production
6,5 m3
Batch #19
Start Time
2026-01-29 16:40
End Time
2026-01-29 16:44
Durată
4,5821125333333335
Production
8,8 m3
Batch #20
Start Time
2026-01-29 16:32
End Time
2026-01-29 16:37
Durată
4,700774816666667
Production
8,1 m3
Batch #21
Start Time
2026-01-29 16:23
End Time
2026-01-29 16:29
Durată
6,8500055500000006
Production
12,2 m3
Batch #22
Start Time
2026-01-29 16:13
End Time
2026-01-29 16:21
Durată
7,354142183333334
Production
11,8 m3
Batch #23
Start Time
2026-01-29 16:08
End Time
2026-01-29 16:12
Durată
4,414050216666666
Production
8,0 m3
Batch #24
Start Time
2026-01-29 16:00
End Time
2026-01-29 16:06
Durată
6,1952124
Production
11,1 m3
Batch #25
Start Time
2026-01-29 15:31
End Time
2026-01-29 15:35
Durată
3,780994616666667
Production
6,4 m3
Batch #26
Start Time
2026-01-29 15:25
End Time
2026-01-29 15:30
Durată
4,459826566666666
Production
8,5 m3
Batch #27
Start Time
2026-01-29 15:23
End Time
2026-01-29 15:28
Durată
4,6102726333333335
Production
7,6 m3
Batch #28
Start Time
2026-01-29 15:17
End Time
2026-01-29 15:22
Durată
5,300309516666667
Production
10,0 m3
Batch #29
Start Time
2026-01-29 15:16
End Time
2026-01-29 15:22
Durată
6,466147483333333
Production
11,3 m3
Batch #30
Start Time
2026-01-29 15:07
End Time
2026-01-29 15:15
Durată
7,675835216666667
Production
13,2 m3
Batch #31
Start Time
2026-01-29 15:06
End Time
2026-01-29 15:13
Durată
6,7027149
Production
12,6 m3
Batch #32
Start Time
2026-01-29 15:00
End Time
2026-01-29 15:04
Durată
4,416355333333333
Production
8,7 m3
Batch #33
Start Time
2026-01-29 15:00
End Time
2026-01-29 15:05
Durată
5,266003833333333
Production
9,4 m3
Batch #34
Start Time
2026-01-29 14:09
End Time
2026-01-29 14:15
Durată
5,7298598
Production
10,4 m3
Batch #35
Start Time
2026-01-29 14:00
End Time
2026-01-29 14:06
Durată
6,914769733333333
Production
13,8 m3
Batch #36
Start Time
2026-01-29 13:45
End Time
2026-01-29 13:49
Durată
3,5734494666666667
Production
6,2 m3
Batch #37
Start Time
2026-01-29 13:36
End Time
2026-01-29 13:44
Durată
7,859371116666667
Production
13,8 m3
Batch #38
Start Time
2026-01-29 13:29
End Time
2026-01-29 13:34
Durată
4,62327775
Production
7,9 m3
Batch #39
Start Time
2026-01-29 13:20
End Time
2026-01-29 13:27
Durată
6,8695022
Production
11,9 m3
Batch #40
Start Time
2026-01-29 13:11
End Time
2026-01-29 13:19
Durată
7,826601766666667
Production
12,7 m3
Batch #41
Start Time
2026-01-29 13:06
End Time
2026-01-29 13:10
Durată
4,250898566666667
Production
8,8 m3
Batch #42
Start Time
2026-01-29 13:00
End Time
2026-01-29 13:04
Durată
4,994819833333334
Production
8,6 m3
Batch #43
Start Time
2026-01-29 12:47
End Time
2026-01-29 12:52
Durată
4,924837116666667
Production
9,7 m3
Batch #44
Start Time
2026-01-29 12:39
End Time
2026-01-29 12:45
Durată
6,1845688333333335
Production
10,5 m3
Batch #45
Start Time
2026-01-29 12:33
End Time
2026-01-29 12:38
Durată
4,7570699
Production
7,9 m3
Batch #46
Start Time
2026-01-29 12:25
End Time
2026-01-29 12:30
Durată
5,512631150000001
Production
9,5 m3
Batch #47
Start Time
2026-01-29 12:14
End Time
2026-01-29 12:22
Durată
7,588272566666666
Production
13,5 m3
Batch #48
Start Time
2026-01-29 12:08
End Time
2026-01-29 12:13
Durată
5,128066416666667
Production
9,5 m3
Batch #49
Start Time
2026-01-29 12:00
End Time
2026-01-29 12:06
Durată
6,459727616666667
Production
12,7 m3
Batch #50
Start Time
2026-01-29 11:53
End Time
2026-01-29 11:53
Durată
0,6739554833333333
Production
1,5 m3
Batch #51
Start Time
2026-01-29 11:47
End Time
2026-01-29 11:51
Durată
4,0418522999999995
Production
7,8 m3
Batch #52
Start Time
2026-01-29 11:38
End Time
2026-01-29 11:46
Durată
7,50215925
Production
12,0 m3
Batch #53
Start Time
2026-01-29 11:30
End Time
2026-01-29 11:36
Durată
5,9198535
Production
11,2 m3
Batch #54
Start Time
2026-01-29 11:24
End Time
2026-01-29 11:29
Durată
4,33667935
Production
8,3 m3
Batch #55
Start Time
2026-01-29 11:17
End Time
2026-01-29 11:22
Durată
4,859206299999999
Production
9,5 m3
Batch #56
Start Time
2026-01-29 11:09
End Time
2026-01-29 11:15
Durată
6,339589933333333
Production
10,9 m3
Batch #57
Start Time
2026-01-29 11:00
End Time
2026-01-29 11:07
Durată
7,101515116666667
Production
12,3 m3
Batch #58
Start Time
2026-01-29 10:39
End Time
2026-01-29 10:42
Durată
3,2247359500000004
Production
5,7 m3
Batch #59
Start Time
2026-01-29 10:30
End Time
2026-01-29 10:37
Durată
6,529104983333334
Production
12,6 m3
Batch #60
Start Time
2026-01-29 10:21
End Time
2026-01-29 10:28
Durată
7,7787639833333335
Production
14,3 m3
Batch #61
Start Time
2026-01-29 10:14
End Time
2026-01-29 10:19
Durată
5,231751933333333
Production
9,9 m3
Batch #62
Start Time
2026-01-29 10:06
End Time
2026-01-29 10:12
Durată
5,821032400000001
Production
10,0 m3
Batch #63
Start Time
2026-01-29 10:00
End Time
2026-01-29 10:05
Durată
5,625975733333333
Production
9,3 m3
Batch #64
Start Time
2026-01-29 09:15
End Time
2026-01-29 09:21
Durată
6,3253359499999995
Production
10,7 m3
Batch #65
Start Time
2026-01-29 09:08
End Time
2026-01-29 09:13
Durată
5,381228566666667
Production
8,1 m3
Batch #66
Start Time
2026-01-29 09:00
End Time
2026-01-29 09:06
Durată
6,232435783333333
Production
11,3 m3
Batch #67
Start Time
2026-01-28 21:00
End Time
2026-01-28 21:02
Durată
2,2807901333333334
Production
4,4 m3
Batch #68
Start Time
2026-01-28 20:00
End Time
2026-01-28 20:05
Durată
5,613262716666667
Production
9,9 m3
Batch #69
Start Time
2026-01-28 19:07
End Time
2026-01-28 19:11
Durată
3,2089157166666666
Production
4,4 m3
Batch #70
Start Time
2026-01-28 19:00
End Time
2026-01-28 19:05
Durată
5,969610149999999
Production
9,1 m3
Batch #71
Start Time
2026-01-28 18:08
End Time
2026-01-28 18:14
Durată
5,709355566666667
Production
9,1 m3
Batch #72
Start Time
2026-01-28 18:00
End Time
2026-01-28 18:06
Durată
6,776971133333333
Production
12,5 m3
Batch #73
Start Time
2026-01-28 17:14
End Time
2026-01-28 17:17
Durată
3,0220502166666665
Production
5,4 m3
Batch #74
Start Time
2026-01-28 17:07
End Time
2026-01-28 17:12
Durată
4,8483339
Production
8,8 m3
Batch #75
Start Time
2026-01-28 17:00
End Time
2026-01-28 17:04
Durată
4,970817616666666
Production
10,3 m3
Batch #76
Start Time
2026-01-28 16:14
End Time
2026-01-28 16:17
Durată
3,06167995
Production
5,5 m3
Batch #77
Start Time
2026-01-28 16:07
End Time
2026-01-28 16:12
Durată
5,197467616666667
Production
9,4 m3
Batch #78
Start Time
2026-01-28 16:00
End Time
2026-01-28 16:05
Durată
5,009327366666667
Production
10,1 m3
Batch #79
Start Time
2026-01-28 15:06
End Time
2026-01-28 15:09
Durată
3,4587777333333336
Production
5,5 m3
Batch #80
Start Time
2026-01-28 15:00
End Time
2026-01-28 15:04
Durată
4,882331883333333
Production
9,9 m3
Batch #81
Start Time
2026-01-28 14:00
End Time
2026-01-28 14:04
Durată
4,97670655
Production
9,1 m3
Batch #82
Start Time
2026-01-28 13:14
End Time
2026-01-28 13:15
Durată
1,5735728999999998
Production
2,9 m3
Batch #83
Start Time
2026-01-28 13:08
End Time
2026-01-28 13:12
Durată
4,807311216666666
Production
8,5 m3
Batch #84
Start Time
2026-01-28 13:00
End Time
2026-01-28 13:05
Durată
5,732097483333334
Production
9,6 m3
Batch #85
Start Time
2026-01-28 12:16
End Time
2026-01-28 12:18
Durată
1,4100689
Production
2,6 m3
Batch #86
Start Time
2026-01-28 12:08
End Time
2026-01-28 12:14
Durată
5,703142150000001
Production
8,9 m3
Batch #87
Start Time
2026-01-28 12:00
End Time
2026-01-28 12:06
Durată
6,2238187
Production
10,4 m3
Batch #88
Start Time
2026-01-28 11:15
End Time
2026-01-28 11:17
Durată
2,69217975
Production
5,1 m3
Batch #89
Start Time
2026-01-28 11:07
End Time
2026-01-28 11:12
Durată
5,62981705
Production
9,7 m3
Batch #90
Start Time
2026-01-28 11:00
End Time
2026-01-28 11:05
Durată
5,265689083333333
Production
9,7 m3
Batch #91
Start Time
2026-01-28 10:13
End Time
2026-01-28 10:16
Durată
2,8494533833333335
Production
5,3 m3
Batch #92
Start Time
2026-01-28 10:06
End Time
2026-01-28 10:10
Durată
4,465475333333333
Production
7,0 m3
Batch #93
Start Time
2026-01-28 10:00
End Time
2026-01-28 10:04
Durată
4,142431866666667
Production
8,5 m3
Batch #94
Start Time
2026-01-28 09:05
End Time
2026-01-28 09:08
Durată
2,2174728666666668
Production
3,9 m3
Batch #95
Start Time
2026-01-28 09:00
End Time
2026-01-28 09:04
Durată
4,69913455
Production
7,7 m3
Batch #96
Start Time
2026-01-27 21:00
End Time
2026-01-27 21:02
Durată
2,4364790166666666
Production
3,4 m3
Batch #97
Start Time
2026-01-27 20:00
End Time
2026-01-27 20:05
Durată
5,662198883333334
Production
9,5 m3
Batch #98
Start Time
2026-01-27 19:09
End Time
2026-01-27 19:11
Durată
2,24101195
Production
4,4 m3
Batch #99
Start Time
2026-01-27 19:00
End Time
2026-01-27 19:07
Durată
7,1073066166666665
Production
12,5 m3
Batch #100
Start Time
2026-01-27 18:12
End Time
2026-01-27 18:15
Durată
3,5648782166666666
Production
7,1 m3
Showing 1 to 100 of 787 cycles