Demo Beton Beta - Batches
Concrete Plant
Total Cycles:
792
Production:
6585,6 m3
| Start Time | End Time | Durată | Production | |
|---|---|---|---|---|
| 2026-01-20 16:07:43 | 2026-01-20 16:12:43 | 4,9943744 | 10,0 m3 | |
|
|
||||
| 2026-01-20 16:00:00 | 2026-01-20 16:05:06 | 5,1065351833333334 | 9,3 m3 | |
|
|
||||
| 2026-01-20 15:09:48 | 2026-01-20 15:11:12 | 1,4148864 | 2,7 m3 | |
|
|
||||
| 2026-01-20 15:00:00 | 2026-01-20 15:06:48 | 6,800923766666667 | 12,6 m3 | |
|
|
||||
| 2026-01-20 14:00:00 | 2026-01-20 14:05:05 | 5,08688245 | 8,6 m3 | |
|
|
||||
| 2026-01-20 13:15:17 | 2026-01-20 13:15:56 | 0,6603409833333332 | 1,3 m3 | |
|
|
||||
| 2026-01-20 13:06:59 | 2026-01-20 13:13:43 | 6,7283319 | 11,4 m3 | |
|
|
||||
| 2026-01-20 13:00:00 | 2026-01-20 13:04:20 | 4,3402742 | 7,1 m3 | |
|
|
||||
| 2026-01-20 12:16:04 | 2026-01-20 12:18:18 | 2,2205662 | 4,1 m3 | |
|
|
||||
| 2026-01-20 12:07:59 | 2026-01-20 12:13:23 | 5,401006916666666 | 10,2 m3 | |
|
|
||||
| 2026-01-20 12:00:00 | 2026-01-20 12:05:44 | 5,746865116666667 | 11,2 m3 | |
|
|
||||
| 2026-01-20 11:15:10 | 2026-01-20 11:16:42 | 1,5475038333333333 | 2,4 m3 | |
|
|
||||
| 2026-01-20 11:07:25 | 2026-01-20 11:13:33 | 6,126064 | 10,9 m3 | |
|
|
||||
| 2026-01-20 11:00:00 | 2026-01-20 11:05:56 | 5,941488316666667 | 10,0 m3 | |
|
|
||||
| 2026-01-20 10:07:34 | 2026-01-20 10:13:40 | 6,1008305499999995 | 10,2 m3 | |
|
|
||||
| 2026-01-20 10:00:00 | 2026-01-20 10:05:55 | 5,922262383333333 | 10,2 m3 | |
|
|
||||
| 2026-01-20 09:07:17 | 2026-01-20 09:09:37 | 2,3338368666666667 | 4,4 m3 | |
|
|
||||
| 2026-01-20 09:00:00 | 2026-01-20 09:04:19 | 4,326286316666667 | 7,3 m3 | |
|
|
||||
| 2026-01-19 21:00:00 | 2026-01-19 21:03:13 | 3,2188651 | 5,3 m3 | |
|
|
||||
| 2026-01-19 20:08:41 | 2026-01-19 20:09:18 | 0,6129161833333333 | 1,5 m3 | |
|
|
||||
| 2026-01-19 20:00:00 | 2026-01-19 20:05:41 | 5,687803 | 10,9 m3 | |
|
|
||||
| 2026-01-19 19:07:56 | 2026-01-19 19:13:21 | 5,409398683333333 | 10,1 m3 | |
|
|
||||
| 2026-01-19 19:00:00 | 2026-01-19 19:06:13 | 6,224050033333333 | 11,5 m3 | |
|
|
||||
| 2026-01-19 18:15:06 | 2026-01-19 18:18:13 | 3,107311866666667 | 5,5 m3 | |
|
|
||||
| 2026-01-19 18:08:17 | 2026-01-19 18:13:48 | 5,520915233333333 | 8,6 m3 | |
|
|
||||
| 2026-01-19 18:00:00 | 2026-01-19 18:06:55 | 6,928806033333333 | 12,1 m3 | |
|
|
||||
| 2026-01-19 17:16:38 | 2026-01-19 17:20:21 | 3,7093905333333335 | 5,7 m3 | |
|
|
||||
| 2026-01-19 17:10:05 | 2026-01-19 17:15:25 | 5,330809516666666 | 9,4 m3 | |
|
|
||||
| 2026-01-19 17:00:00 | 2026-01-19 17:07:29 | 7,496501966666667 | 13,8 m3 | |
|
|
||||
| 2026-01-19 16:15:28 | 2026-01-19 16:21:24 | 5,937766300000001 | 11,6 m3 | |
|
|
||||
| 2026-01-19 16:09:00 | 2026-01-19 16:13:52 | 4,867803583333333 | 7,7 m3 | |
|
|
||||
| 2026-01-19 16:00:00 | 2026-01-19 16:06:01 | 6,025634966666667 | 11,7 m3 | |
|
|
||||
| 2026-01-19 15:07:15 | 2026-01-19 15:11:06 | 3,84438915 | 6,2 m3 | |
|
|
||||
| 2026-01-19 15:00:00 | 2026-01-19 15:06:14 | 6,239304066666667 | 9,7 m3 | |
|
|
||||
| 2026-01-19 14:06:51 | 2026-01-19 14:09:00 | 2,1514721333333333 | 4,4 m3 | |
|
|
||||
| 2026-01-19 14:00:00 | 2026-01-19 14:04:36 | 4,60306135 | 7,5 m3 | |
|
|
||||
| 2026-01-19 13:16:10 | 2026-01-19 13:16:55 | 0,74355085 | 1,5 m3 | |
|
|
||||
| 2026-01-19 13:08:04 | 2026-01-19 13:15:09 | 7,077380516666667 | 12,5 m3 | |
|
|
||||
| 2026-01-19 13:00:00 | 2026-01-19 13:06:29 | 6,498889883333334 | 12,5 m3 | |
|
|
||||
| 2026-01-19 12:15:36 | 2026-01-19 12:21:15 | 5,653412833333333 | 9,1 m3 | |
|
|
||||
| 2026-01-19 12:08:55 | 2026-01-19 12:14:11 | 5,265545516666666 | 8,6 m3 | |
|
|
||||
| 2026-01-19 12:00:00 | 2026-01-19 12:06:11 | 6,1870278333333335 | 10,8 m3 | |
|
|
||||
| 2026-01-19 11:18:42 | 2026-01-19 11:20:49 | 2,12179575 | 3,7 m3 | |
|
|
||||
| 2026-01-19 11:10:09 | 2026-01-19 11:16:37 | 6,473036083333333 | 12,8 m3 | |
|
|
||||
| 2026-01-19 11:00:00 | 2026-01-19 11:07:23 | 7,38838405 | 13,5 m3 | |
|
|
||||
| 2026-01-19 10:15:06 | 2026-01-19 10:19:08 | 4,017593283333333 | 6,9 m3 | |
|
|
||||
| 2026-01-19 10:06:18 | 2026-01-19 10:12:27 | 6,15911415 | 11,3 m3 | |
|
|
||||
| 2026-01-19 10:00:00 | 2026-01-19 10:05:07 | 5,123963883333333 | 8,8 m3 | |
|
|
||||
| 2026-01-19 09:09:26 | 2026-01-19 09:10:13 | 0,7817490666666667 | 1,5 m3 | |
|
|
||||
| 2026-01-19 09:00:00 | 2026-01-19 09:07:14 | 7,236929833333334 | 12,7 m3 | |
|
|
||||
| 2026-01-18 21:00:00 | 2026-01-18 21:01:39 | 1,6650361166666667 | 2,4 m3 | |
|
|
||||
| 2026-01-18 20:00:00 | 2026-01-18 20:03:03 | 3,0573915499999997 | 5,9 m3 | |
|
|
||||
| 2026-01-18 19:00:00 | 2026-01-18 19:05:13 | 5,220821866666666 | 9,7 m3 | |
|
|
||||
| 2026-01-18 18:08:11 | 2026-01-18 18:08:59 | 0,7985698666666666 | 1,0 m3 | |
|
|
||||
| 2026-01-18 18:00:00 | 2026-01-18 18:05:50 | 5,842306949999999 | 11,1 m3 | |
|
|
||||
| 2026-01-18 17:00:00 | 2026-01-18 17:07:42 | 7,712001233333334 | 13,8 m3 | |
|
|
||||
| 2026-01-18 16:06:35 | 2026-01-18 16:09:35 | 2,994355833333333 | 5,2 m3 | |
|
|
||||
| 2026-01-18 16:00:00 | 2026-01-18 16:05:00 | 5,0149176833333335 | 7,7 m3 | |
|
|
||||
| 2026-01-18 15:00:00 | 2026-01-18 15:04:14 | 4,240944066666667 | 7,9 m3 | |
|
|
||||
| 2026-01-18 14:00:00 | 2026-01-18 14:02:30 | 2,5136073333333333 | 5,7 m3 | |
|
|
||||
| 2026-01-18 13:00:00 | 2026-01-18 13:06:29 | 6,4850744 | 12,2 m3 | |
|
|
||||
| 2026-01-18 12:08:18 | 2026-01-18 12:09:02 | 0,7313202166666667 | 1,2 m3 | |
|
|
||||
| 2026-01-18 12:00:00 | 2026-01-18 12:06:39 | 6,6577498833333335 | 12,3 m3 | |
|
|
||||
| 2026-01-18 11:07:02 | 2026-01-18 11:09:55 | 2,8763147 | 4,8 m3 | |
|
|
||||
| 2026-01-18 11:00:00 | 2026-01-18 11:04:16 | 4,277054633333334 | 7,6 m3 | |
|
|
||||
| 2026-01-18 10:07:24 | 2026-01-18 10:09:03 | 1,6559973166666666 | 2,4 m3 | |
|
|
||||
| 2026-01-18 10:00:00 | 2026-01-18 10:05:15 | 5,259454933333333 | 8,7 m3 | |
|
|
||||
| 2026-01-18 09:00:00 | 2026-01-18 09:03:26 | 3,441547816666667 | 6,3 m3 | |
|
|
||||
| 2026-01-17 21:00:00 | 2026-01-17 21:01:19 | 1,3326208333333334 | 2,5 m3 | |
|
|
||||
| 2026-01-17 20:00:00 | 2026-01-17 20:03:11 | 3,1900699166666664 | 5,0 m3 | |
|
|
||||
| 2026-01-17 19:00:00 | 2026-01-17 19:05:00 | 5,01476575 | 8,5 m3 | |
|
|
||||
| 2026-01-17 18:00:00 | 2026-01-17 18:06:40 | 6,678255116666667 | 11,9 m3 | |
|
|
||||
| 2026-01-17 17:00:00 | 2026-01-17 17:07:56 | 7,9373105 | 11,8 m3 | |
|
|
||||
| 2026-01-17 16:07:05 | 2026-01-17 16:09:26 | 2,3606125833333333 | 4,4 m3 | |
|
|
||||
| 2026-01-17 16:00:00 | 2026-01-17 16:05:40 | 5,669224233333334 | 10,2 m3 | |
|
|
||||
| 2026-01-17 15:00:00 | 2026-01-17 15:04:26 | 4,435151883333333 | 8,2 m3 | |
|
|
||||
| 2026-01-17 14:00:00 | 2026-01-17 14:02:41 | 2,6923934666666667 | 5,1 m3 | |
|
|
||||
| 2026-01-17 13:07:08 | 2026-01-17 13:08:49 | 1,6849761333333333 | 2,3 m3 | |
|
|
||||
| 2026-01-17 13:00:00 | 2026-01-17 13:05:32 | 5,538244933333333 | 9,3 m3 | |
|
|
||||
| 2026-01-17 12:00:00 | 2026-01-17 12:07:15 | 7,261358783333334 | 13,3 m3 | |
|
|
||||
| 2026-01-17 11:06:49 | 2026-01-17 11:08:52 | 2,05064015 | 3,8 m3 | |
|
|
||||
| 2026-01-17 11:00:00 | 2026-01-17 11:05:36 | 5,61303445 | 9,1 m3 | |
|
|
||||
| 2026-01-17 10:06:37 | 2026-01-17 10:08:57 | 2,33590135 | 4,4 m3 | |
|
|
||||
| 2026-01-17 10:00:00 | 2026-01-17 10:04:49 | 4,82243405 | 8,4 m3 | |
|
|
||||
| 2026-01-17 09:00:00 | 2026-01-17 09:03:45 | 3,7652909166666664 | 6,8 m3 | |
|
|
||||
| 2026-01-16 21:00:00 | 2026-01-16 21:03:10 | 3,1687114333333333 | 5,4 m3 | |
|
|
||||
| 2026-01-16 20:06:39 | 2026-01-16 20:07:25 | 0,75725725 | 1,5 m3 | |
|
|
||||
| 2026-01-16 20:00:00 | 2026-01-16 20:05:36 | 5,614723283333333 | 9,4 m3 | |
|
|
||||
| 2026-01-16 19:08:20 | 2026-01-16 19:12:53 | 4,5553423833333335 | 8,8 m3 | |
|
|
||||
| 2026-01-16 19:00:00 | 2026-01-16 19:06:38 | 6,639172866666667 | 12,0 m3 | |
|
|
||||
| 2026-01-16 18:15:17 | 2026-01-16 18:16:46 | 1,4793434166666666 | 2,3 m3 | |
|
|
||||
| 2026-01-16 18:07:17 | 2026-01-16 18:13:46 | 6,4916426000000005 | 11,0 m3 | |
|
|
||||
| 2026-01-16 18:00:00 | 2026-01-16 18:06:12 | 6,205390499999999 | 10,4 m3 | |
|
|
||||
| 2026-01-16 17:19:33 | 2026-01-16 17:21:02 | 1,4835470833333335 | 2,5 m3 | |
|
|
||||
| 2026-01-16 17:10:54 | 2026-01-16 17:17:38 | 6,721837249999999 | 12,6 m3 | |
|
|
||||
| 2026-01-16 17:00:00 | 2026-01-16 17:08:05 | 8,098826383333334 | 13,7 m3 | |
|
|
||||
| 2026-01-16 16:18:06 | 2026-01-16 16:19:00 | 0,89504005 | 1,4 m3 | |
|
|
||||
| 2026-01-16 16:09:00 | 2026-01-16 16:16:03 | 7,05409865 | 14,0 m3 | |
|
|
||||
| 2026-01-16 16:00:00 | 2026-01-16 16:07:42 | 7,705597983333333 | 13,5 m3 | |
|
|
||||
| 2026-01-16 15:10:01 | 2026-01-16 15:11:17 | 1,2668211166666665 | 2,9 m3 | |
|
|
||||
Batch #1
Start Time
2026-01-20 16:07
End Time
2026-01-20 16:12
Durată
4,9943744
Production
10,0 m3
Batch #2
Start Time
2026-01-20 16:00
End Time
2026-01-20 16:05
Durată
5,1065351833333334
Production
9,3 m3
Batch #3
Start Time
2026-01-20 15:09
End Time
2026-01-20 15:11
Durată
1,4148864
Production
2,7 m3
Batch #4
Start Time
2026-01-20 15:00
End Time
2026-01-20 15:06
Durată
6,800923766666667
Production
12,6 m3
Batch #5
Start Time
2026-01-20 14:00
End Time
2026-01-20 14:05
Durată
5,08688245
Production
8,6 m3
Batch #6
Start Time
2026-01-20 13:15
End Time
2026-01-20 13:15
Durată
0,6603409833333332
Production
1,3 m3
Batch #7
Start Time
2026-01-20 13:06
End Time
2026-01-20 13:13
Durată
6,7283319
Production
11,4 m3
Batch #8
Start Time
2026-01-20 13:00
End Time
2026-01-20 13:04
Durată
4,3402742
Production
7,1 m3
Batch #9
Start Time
2026-01-20 12:16
End Time
2026-01-20 12:18
Durată
2,2205662
Production
4,1 m3
Batch #10
Start Time
2026-01-20 12:07
End Time
2026-01-20 12:13
Durată
5,401006916666666
Production
10,2 m3
Batch #11
Start Time
2026-01-20 12:00
End Time
2026-01-20 12:05
Durată
5,746865116666667
Production
11,2 m3
Batch #12
Start Time
2026-01-20 11:15
End Time
2026-01-20 11:16
Durată
1,5475038333333333
Production
2,4 m3
Batch #13
Start Time
2026-01-20 11:07
End Time
2026-01-20 11:13
Durată
6,126064
Production
10,9 m3
Batch #14
Start Time
2026-01-20 11:00
End Time
2026-01-20 11:05
Durată
5,941488316666667
Production
10,0 m3
Batch #15
Start Time
2026-01-20 10:07
End Time
2026-01-20 10:13
Durată
6,1008305499999995
Production
10,2 m3
Batch #16
Start Time
2026-01-20 10:00
End Time
2026-01-20 10:05
Durată
5,922262383333333
Production
10,2 m3
Batch #17
Start Time
2026-01-20 09:07
End Time
2026-01-20 09:09
Durată
2,3338368666666667
Production
4,4 m3
Batch #18
Start Time
2026-01-20 09:00
End Time
2026-01-20 09:04
Durată
4,326286316666667
Production
7,3 m3
Batch #19
Start Time
2026-01-19 21:00
End Time
2026-01-19 21:03
Durată
3,2188651
Production
5,3 m3
Batch #20
Start Time
2026-01-19 20:08
End Time
2026-01-19 20:09
Durată
0,6129161833333333
Production
1,5 m3
Batch #21
Start Time
2026-01-19 20:00
End Time
2026-01-19 20:05
Durată
5,687803
Production
10,9 m3
Batch #22
Start Time
2026-01-19 19:07
End Time
2026-01-19 19:13
Durată
5,409398683333333
Production
10,1 m3
Batch #23
Start Time
2026-01-19 19:00
End Time
2026-01-19 19:06
Durată
6,224050033333333
Production
11,5 m3
Batch #24
Start Time
2026-01-19 18:15
End Time
2026-01-19 18:18
Durată
3,107311866666667
Production
5,5 m3
Batch #25
Start Time
2026-01-19 18:08
End Time
2026-01-19 18:13
Durată
5,520915233333333
Production
8,6 m3
Batch #26
Start Time
2026-01-19 18:00
End Time
2026-01-19 18:06
Durată
6,928806033333333
Production
12,1 m3
Batch #27
Start Time
2026-01-19 17:16
End Time
2026-01-19 17:20
Durată
3,7093905333333335
Production
5,7 m3
Batch #28
Start Time
2026-01-19 17:10
End Time
2026-01-19 17:15
Durată
5,330809516666666
Production
9,4 m3
Batch #29
Start Time
2026-01-19 17:00
End Time
2026-01-19 17:07
Durată
7,496501966666667
Production
13,8 m3
Batch #30
Start Time
2026-01-19 16:15
End Time
2026-01-19 16:21
Durată
5,937766300000001
Production
11,6 m3
Batch #31
Start Time
2026-01-19 16:09
End Time
2026-01-19 16:13
Durată
4,867803583333333
Production
7,7 m3
Batch #32
Start Time
2026-01-19 16:00
End Time
2026-01-19 16:06
Durată
6,025634966666667
Production
11,7 m3
Batch #33
Start Time
2026-01-19 15:07
End Time
2026-01-19 15:11
Durată
3,84438915
Production
6,2 m3
Batch #34
Start Time
2026-01-19 15:00
End Time
2026-01-19 15:06
Durată
6,239304066666667
Production
9,7 m3
Batch #35
Start Time
2026-01-19 14:06
End Time
2026-01-19 14:09
Durată
2,1514721333333333
Production
4,4 m3
Batch #36
Start Time
2026-01-19 14:00
End Time
2026-01-19 14:04
Durată
4,60306135
Production
7,5 m3
Batch #37
Start Time
2026-01-19 13:16
End Time
2026-01-19 13:16
Durată
0,74355085
Production
1,5 m3
Batch #38
Start Time
2026-01-19 13:08
End Time
2026-01-19 13:15
Durată
7,077380516666667
Production
12,5 m3
Batch #39
Start Time
2026-01-19 13:00
End Time
2026-01-19 13:06
Durată
6,498889883333334
Production
12,5 m3
Batch #40
Start Time
2026-01-19 12:15
End Time
2026-01-19 12:21
Durată
5,653412833333333
Production
9,1 m3
Batch #41
Start Time
2026-01-19 12:08
End Time
2026-01-19 12:14
Durată
5,265545516666666
Production
8,6 m3
Batch #42
Start Time
2026-01-19 12:00
End Time
2026-01-19 12:06
Durată
6,1870278333333335
Production
10,8 m3
Batch #43
Start Time
2026-01-19 11:18
End Time
2026-01-19 11:20
Durată
2,12179575
Production
3,7 m3
Batch #44
Start Time
2026-01-19 11:10
End Time
2026-01-19 11:16
Durată
6,473036083333333
Production
12,8 m3
Batch #45
Start Time
2026-01-19 11:00
End Time
2026-01-19 11:07
Durată
7,38838405
Production
13,5 m3
Batch #46
Start Time
2026-01-19 10:15
End Time
2026-01-19 10:19
Durată
4,017593283333333
Production
6,9 m3
Batch #47
Start Time
2026-01-19 10:06
End Time
2026-01-19 10:12
Durată
6,15911415
Production
11,3 m3
Batch #48
Start Time
2026-01-19 10:00
End Time
2026-01-19 10:05
Durată
5,123963883333333
Production
8,8 m3
Batch #49
Start Time
2026-01-19 09:09
End Time
2026-01-19 09:10
Durată
0,7817490666666667
Production
1,5 m3
Batch #50
Start Time
2026-01-19 09:00
End Time
2026-01-19 09:07
Durată
7,236929833333334
Production
12,7 m3
Batch #51
Start Time
2026-01-18 21:00
End Time
2026-01-18 21:01
Durată
1,6650361166666667
Production
2,4 m3
Batch #52
Start Time
2026-01-18 20:00
End Time
2026-01-18 20:03
Durată
3,0573915499999997
Production
5,9 m3
Batch #53
Start Time
2026-01-18 19:00
End Time
2026-01-18 19:05
Durată
5,220821866666666
Production
9,7 m3
Batch #54
Start Time
2026-01-18 18:08
End Time
2026-01-18 18:08
Durată
0,7985698666666666
Production
1,0 m3
Batch #55
Start Time
2026-01-18 18:00
End Time
2026-01-18 18:05
Durată
5,842306949999999
Production
11,1 m3
Batch #56
Start Time
2026-01-18 17:00
End Time
2026-01-18 17:07
Durată
7,712001233333334
Production
13,8 m3
Batch #57
Start Time
2026-01-18 16:06
End Time
2026-01-18 16:09
Durată
2,994355833333333
Production
5,2 m3
Batch #58
Start Time
2026-01-18 16:00
End Time
2026-01-18 16:05
Durată
5,0149176833333335
Production
7,7 m3
Batch #59
Start Time
2026-01-18 15:00
End Time
2026-01-18 15:04
Durată
4,240944066666667
Production
7,9 m3
Batch #60
Start Time
2026-01-18 14:00
End Time
2026-01-18 14:02
Durată
2,5136073333333333
Production
5,7 m3
Batch #61
Start Time
2026-01-18 13:00
End Time
2026-01-18 13:06
Durată
6,4850744
Production
12,2 m3
Batch #62
Start Time
2026-01-18 12:08
End Time
2026-01-18 12:09
Durată
0,7313202166666667
Production
1,2 m3
Batch #63
Start Time
2026-01-18 12:00
End Time
2026-01-18 12:06
Durată
6,6577498833333335
Production
12,3 m3
Batch #64
Start Time
2026-01-18 11:07
End Time
2026-01-18 11:09
Durată
2,8763147
Production
4,8 m3
Batch #65
Start Time
2026-01-18 11:00
End Time
2026-01-18 11:04
Durată
4,277054633333334
Production
7,6 m3
Batch #66
Start Time
2026-01-18 10:07
End Time
2026-01-18 10:09
Durată
1,6559973166666666
Production
2,4 m3
Batch #67
Start Time
2026-01-18 10:00
End Time
2026-01-18 10:05
Durată
5,259454933333333
Production
8,7 m3
Batch #68
Start Time
2026-01-18 09:00
End Time
2026-01-18 09:03
Durată
3,441547816666667
Production
6,3 m3
Batch #69
Start Time
2026-01-17 21:00
End Time
2026-01-17 21:01
Durată
1,3326208333333334
Production
2,5 m3
Batch #70
Start Time
2026-01-17 20:00
End Time
2026-01-17 20:03
Durată
3,1900699166666664
Production
5,0 m3
Batch #71
Start Time
2026-01-17 19:00
End Time
2026-01-17 19:05
Durată
5,01476575
Production
8,5 m3
Batch #72
Start Time
2026-01-17 18:00
End Time
2026-01-17 18:06
Durată
6,678255116666667
Production
11,9 m3
Batch #73
Start Time
2026-01-17 17:00
End Time
2026-01-17 17:07
Durată
7,9373105
Production
11,8 m3
Batch #74
Start Time
2026-01-17 16:07
End Time
2026-01-17 16:09
Durată
2,3606125833333333
Production
4,4 m3
Batch #75
Start Time
2026-01-17 16:00
End Time
2026-01-17 16:05
Durată
5,669224233333334
Production
10,2 m3
Batch #76
Start Time
2026-01-17 15:00
End Time
2026-01-17 15:04
Durată
4,435151883333333
Production
8,2 m3
Batch #77
Start Time
2026-01-17 14:00
End Time
2026-01-17 14:02
Durată
2,6923934666666667
Production
5,1 m3
Batch #78
Start Time
2026-01-17 13:07
End Time
2026-01-17 13:08
Durată
1,6849761333333333
Production
2,3 m3
Batch #79
Start Time
2026-01-17 13:00
End Time
2026-01-17 13:05
Durată
5,538244933333333
Production
9,3 m3
Batch #80
Start Time
2026-01-17 12:00
End Time
2026-01-17 12:07
Durată
7,261358783333334
Production
13,3 m3
Batch #81
Start Time
2026-01-17 11:06
End Time
2026-01-17 11:08
Durată
2,05064015
Production
3,8 m3
Batch #82
Start Time
2026-01-17 11:00
End Time
2026-01-17 11:05
Durată
5,61303445
Production
9,1 m3
Batch #83
Start Time
2026-01-17 10:06
End Time
2026-01-17 10:08
Durată
2,33590135
Production
4,4 m3
Batch #84
Start Time
2026-01-17 10:00
End Time
2026-01-17 10:04
Durată
4,82243405
Production
8,4 m3
Batch #85
Start Time
2026-01-17 09:00
End Time
2026-01-17 09:03
Durată
3,7652909166666664
Production
6,8 m3
Batch #86
Start Time
2026-01-16 21:00
End Time
2026-01-16 21:03
Durată
3,1687114333333333
Production
5,4 m3
Batch #87
Start Time
2026-01-16 20:06
End Time
2026-01-16 20:07
Durată
0,75725725
Production
1,5 m3
Batch #88
Start Time
2026-01-16 20:00
End Time
2026-01-16 20:05
Durată
5,614723283333333
Production
9,4 m3
Batch #89
Start Time
2026-01-16 19:08
End Time
2026-01-16 19:12
Durată
4,5553423833333335
Production
8,8 m3
Batch #90
Start Time
2026-01-16 19:00
End Time
2026-01-16 19:06
Durată
6,639172866666667
Production
12,0 m3
Batch #91
Start Time
2026-01-16 18:15
End Time
2026-01-16 18:16
Durată
1,4793434166666666
Production
2,3 m3
Batch #92
Start Time
2026-01-16 18:07
End Time
2026-01-16 18:13
Durată
6,4916426000000005
Production
11,0 m3
Batch #93
Start Time
2026-01-16 18:00
End Time
2026-01-16 18:06
Durată
6,205390499999999
Production
10,4 m3
Batch #94
Start Time
2026-01-16 17:19
End Time
2026-01-16 17:21
Durată
1,4835470833333335
Production
2,5 m3
Batch #95
Start Time
2026-01-16 17:10
End Time
2026-01-16 17:17
Durată
6,721837249999999
Production
12,6 m3
Batch #96
Start Time
2026-01-16 17:00
End Time
2026-01-16 17:08
Durată
8,098826383333334
Production
13,7 m3
Batch #97
Start Time
2026-01-16 16:18
End Time
2026-01-16 16:19
Durată
0,89504005
Production
1,4 m3
Batch #98
Start Time
2026-01-16 16:09
End Time
2026-01-16 16:16
Durată
7,05409865
Production
14,0 m3
Batch #99
Start Time
2026-01-16 16:00
End Time
2026-01-16 16:07
Durată
7,705597983333333
Production
13,5 m3
Batch #100
Start Time
2026-01-16 15:10
End Time
2026-01-16 15:11
Durată
1,2668211166666665
Production
2,9 m3