Demo Beton Beta - Batches
Concrete Plant
Total Cycles:
792
Production:
6585,6 m3
| Start Time | End Time | Durată | Production | |
|---|---|---|---|---|
| 2026-01-16 15:00:00 | 2026-01-16 15:07:26 | 7,447959833333333 | 13,2 m3 | |
|
|
||||
| 2026-01-16 14:00:00 | 2026-01-16 14:05:50 | 5,841763516666666 | 10,8 m3 | |
|
|
||||
| 2026-01-16 13:15:56 | 2026-01-16 13:18:12 | 2,2738449833333334 | 4,5 m3 | |
|
|
||||
| 2026-01-16 13:07:44 | 2026-01-16 13:13:19 | 5,577031983333333 | 9,0 m3 | |
|
|
||||
| 2026-01-16 13:00:00 | 2026-01-16 13:06:41 | 6,69514365 | 12,1 m3 | |
|
|
||||
| 2026-01-16 12:16:55 | 2026-01-16 12:21:52 | 4,941518966666666 | 7,7 m3 | |
|
|
||||
| 2026-01-16 12:09:50 | 2026-01-16 12:14:00 | 4,167635433333333 | 8,0 m3 | |
|
|
||||
| 2026-01-16 12:00:00 | 2026-01-16 12:06:57 | 6,9578300833333335 | 10,7 m3 | |
|
|
||||
| 2026-01-16 11:21:16 | 2026-01-16 11:21:57 | 0,6936281999999999 | 1,5 m3 | |
|
|
||||
| 2026-01-16 11:13:12 | 2026-01-16 11:18:38 | 5,423575516666667 | 8,9 m3 | |
|
|
||||
| 2026-01-16 11:07:46 | 2026-01-16 11:12:08 | 4,368319666666666 | 7,7 m3 | |
|
|
||||
| 2026-01-16 11:00:00 | 2026-01-16 11:05:28 | 5,4781839 | 9,2 m3 | |
|
|
||||
| 2026-01-16 10:17:37 | 2026-01-16 10:19:02 | 1,4072688999999998 | 2,9 m3 | |
|
|
||||
| 2026-01-16 10:07:46 | 2026-01-16 10:15:25 | 7,659382216666667 | 12,9 m3 | |
|
|
||||
| 2026-01-16 10:00:00 | 2026-01-16 10:05:17 | 5,290225449999999 | 9,1 m3 | |
|
|
||||
| 2026-01-16 09:07:38 | 2026-01-16 09:10:00 | 2,36289875 | 3,8 m3 | |
|
|
||||
| 2026-01-16 09:00:00 | 2026-01-16 09:05:05 | 5,095748066666667 | 9,3 m3 | |
|
|
||||
| 2026-01-15 21:00:00 | 2026-01-15 21:02:14 | 2,238550066666667 | 3,7 m3 | |
|
|
||||
| 2026-01-15 20:00:00 | 2026-01-15 20:04:17 | 4,286952333333333 | 8,3 m3 | |
|
|
||||
| 2026-01-15 19:07:09 | 2026-01-15 19:11:36 | 4,442751583333333 | 8,2 m3 | |
|
|
||||
| 2026-01-15 19:00:00 | 2026-01-15 19:04:44 | 4,74181395 | 8,3 m3 | |
|
|
||||
| 2026-01-15 18:10:51 | 2026-01-15 18:14:47 | 3,9381064833333337 | 6,9 m3 | |
|
|
||||
| 2026-01-15 18:00:00 | 2026-01-15 18:08:08 | 8,1424083 | 13,7 m3 | |
|
|
||||
| 2026-01-15 17:08:36 | 2026-01-15 17:13:51 | 5,2598218333333335 | 10,0 m3 | |
|
|
||||
| 2026-01-15 17:00:00 | 2026-01-15 17:07:18 | 7,302251633333333 | 12,9 m3 | |
|
|
||||
| 2026-01-15 16:07:10 | 2026-01-15 16:13:34 | 6,401141683333334 | 12,8 m3 | |
|
|
||||
| 2026-01-15 16:00:00 | 2026-01-15 16:05:50 | 5,8363243 | 10,0 m3 | |
|
|
||||
| 2026-01-15 15:07:48 | 2026-01-15 15:09:17 | 1,4775679333333334 | 2,4 m3 | |
|
|
||||
| 2026-01-15 15:00:00 | 2026-01-15 15:06:04 | 6,083153133333334 | 9,7 m3 | |
|
|
||||
| 2026-01-15 14:00:00 | 2026-01-15 14:04:25 | 4,4220784166666665 | 8,8 m3 | |
|
|
||||
| 2026-01-15 13:06:45 | 2026-01-15 13:12:51 | 6,097223516666667 | 11,1 m3 | |
|
|
||||
| 2026-01-15 13:00:00 | 2026-01-15 13:05:14 | 5,238422616666667 | 9,8 m3 | |
|
|
||||
| 2026-01-15 12:09:59 | 2026-01-15 12:15:08 | 5,142347183333333 | 8,9 m3 | |
|
|
||||
| 2026-01-15 12:00:00 | 2026-01-15 12:07:19 | 7,328212716666667 | 13,3 m3 | |
|
|
||||
| 2026-01-15 11:13:30 | 2026-01-15 11:15:48 | 2,29864895 | 4,1 m3 | |
|
|
||||
| 2026-01-15 11:07:59 | 2026-01-15 11:12:07 | 4,1374000833333335 | 8,5 m3 | |
|
|
||||
| 2026-01-15 11:00:00 | 2026-01-15 11:06:10 | 6,167681366666667 | 11,1 m3 | |
|
|
||||
| 2026-01-15 10:07:53 | 2026-01-15 10:12:13 | 4,3324270333333335 | 8,1 m3 | |
|
|
||||
| 2026-01-15 10:00:00 | 2026-01-15 10:06:23 | 6,396019766666667 | 11,5 m3 | |
|
|
||||
| 2026-01-15 09:00:00 | 2026-01-15 09:06:02 | 6,035547183333334 | 9,9 m3 | |
|
|
||||
| 2026-01-14 21:00:00 | 2026-01-14 21:02:00 | 2,0004331166666667 | 4,4 m3 | |
|
|
||||
| 2026-01-14 20:00:00 | 2026-01-14 20:05:33 | 5,55911845 | 9,5 m3 | |
|
|
||||
| 2026-01-14 19:07:05 | 2026-01-14 19:11:28 | 4,374333433333334 | 7,8 m3 | |
|
|
||||
| 2026-01-14 19:00:00 | 2026-01-14 19:05:04 | 5,077721966666667 | 9,5 m3 | |
|
|
||||
| 2026-01-14 18:13:34 | 2026-01-14 18:16:02 | 2,470014716666667 | 3,5 m3 | |
|
|
||||
| 2026-01-14 18:06:32 | 2026-01-14 18:12:14 | 5,707532116666667 | 11,2 m3 | |
|
|
||||
| 2026-01-14 18:00:00 | 2026-01-14 18:04:47 | 4,785178733333334 | 7,8 m3 | |
|
|
||||
| 2026-01-14 17:09:00 | 2026-01-14 17:16:23 | 7,391958216666667 | 13,4 m3 | |
|
|
||||
| 2026-01-14 17:00:00 | 2026-01-14 17:06:10 | 6,174017866666667 | 12,1 m3 | |
|
|
||||
| 2026-01-14 16:16:15 | 2026-01-14 16:18:13 | 1,9799059666666667 | 3,5 m3 | |
|
|
||||
| 2026-01-14 16:09:42 | 2026-01-14 16:14:02 | 4,334633183333334 | 8,7 m3 | |
|
|
||||
| 2026-01-14 16:00:00 | 2026-01-14 16:07:12 | 7,200663433333333 | 13,1 m3 | |
|
|
||||
| 2026-01-14 15:07:59 | 2026-01-14 15:10:22 | 2,3764811833333335 | 4,2 m3 | |
|
|
||||
| 2026-01-14 15:00:00 | 2026-01-14 15:05:51 | 5,863148833333333 | 10,4 m3 | |
|
|
||||
| 2026-01-14 14:00:00 | 2026-01-14 14:05:30 | 5,5077487 | 10,2 m3 | |
|
|
||||
| 2026-01-14 13:13:02 | 2026-01-14 13:15:49 | 2,7785771666666665 | 5,7 m3 | |
|
|
||||
| 2026-01-14 13:06:38 | 2026-01-14 13:11:01 | 4,390876866666667 | 8,4 m3 | |
|
|
||||
| 2026-01-14 13:00:00 | 2026-01-14 13:04:59 | 4,98724195 | 9,7 m3 | |
|
|
||||
| 2026-01-14 12:12:40 | 2026-01-14 12:17:55 | 5,26110825 | 8,8 m3 | |
|
|
||||
| 2026-01-14 12:06:04 | 2026-01-14 12:10:29 | 4,4092522 | 8,3 m3 | |
|
|
||||
| 2026-01-14 12:00:00 | 2026-01-14 12:04:31 | 4,524985683333333 | 8,5 m3 | |
|
|
||||
| 2026-01-14 11:16:10 | 2026-01-14 11:16:54 | 0,7237914166666666 | 1,5 m3 | |
|
|
||||
| 2026-01-14 11:07:09 | 2026-01-14 11:14:58 | 7,82077885 | 12,2 m3 | |
|
|
||||
| 2026-01-14 11:00:00 | 2026-01-14 11:05:23 | 5,3912272 | 10,2 m3 | |
|
|
||||
| 2026-01-14 10:15:45 | 2026-01-14 10:18:11 | 2,4494065333333332 | 3,9 m3 | |
|
|
||||
| 2026-01-14 10:07:24 | 2026-01-14 10:13:29 | 6,0811177333333335 | 10,7 m3 | |
|
|
||||
| 2026-01-14 10:00:00 | 2026-01-14 10:04:43 | 4,719192250000001 | 8,6 m3 | |
|
|
||||
| 2026-01-14 09:08:14 | 2026-01-14 09:09:04 | 0,8358671 | 1,4 m3 | |
|
|
||||
| 2026-01-14 09:00:00 | 2026-01-14 09:05:48 | 5,802086366666667 | 11,1 m3 | |
|
|
||||
| 2026-01-13 21:00:00 | 2026-01-13 21:02:55 | 2,9232507333333335 | 5,5 m3 | |
|
|
||||
| 2026-01-13 20:00:00 | 2026-01-13 20:05:47 | 5,797508466666667 | 10,5 m3 | |
|
|
||||
| 2026-01-13 19:10:06 | 2026-01-13 19:13:08 | 3,020184583333333 | 5,3 m3 | |
|
|
||||
| 2026-01-13 19:00:00 | 2026-01-13 19:07:51 | 7,864943433333334 | 14,2 m3 | |
|
|
||||
| 2026-01-13 18:17:19 | 2026-01-13 18:18:10 | 0,8542813 | 1,5 m3 | |
|
|
||||
| 2026-01-13 18:09:48 | 2026-01-13 18:15:54 | 6,1009712 | 10,8 m3 | |
|
|
||||
| 2026-01-13 18:00:00 | 2026-01-13 18:06:50 | 6,839012016666667 | 12,5 m3 | |
|
|
||||
| 2026-01-13 17:16:07 | 2026-01-13 17:19:03 | 2,9368586666666667 | 5,5 m3 | |
|
|
||||
| 2026-01-13 17:07:32 | 2026-01-13 17:14:16 | 6,741951816666667 | 11,5 m3 | |
|
|
||||
| 2026-01-13 17:00:00 | 2026-01-13 17:05:34 | 5,570017483333333 | 10,1 m3 | |
|
|
||||
| 2026-01-13 16:16:13 | 2026-01-13 16:19:13 | 2,9972925666666668 | 5,9 m3 | |
|
|
||||
| 2026-01-13 16:09:13 | 2026-01-13 16:13:55 | 4,701420233333334 | 7,7 m3 | |
|
|
||||
| 2026-01-13 16:00:00 | 2026-01-13 16:07:48 | 7,810635016666667 | 13,0 m3 | |
|
|
||||
| 2026-01-13 15:06:53 | 2026-01-13 15:10:31 | 3,6313707166666664 | 7,0 m3 | |
|
|
||||
| 2026-01-13 15:00:00 | 2026-01-13 15:05:19 | 5,33261465 | 9,6 m3 | |
|
|
||||
| 2026-01-13 14:00:00 | 2026-01-13 14:05:48 | 5,8013302 | 11,5 m3 | |
|
|
||||
| 2026-01-13 13:08:44 | 2026-01-13 13:15:30 | 6,7748650999999995 | 12,5 m3 | |
|
|
||||
| 2026-01-13 13:00:00 | 2026-01-13 13:06:14 | 6,235145716666667 | 11,9 m3 | |
|
|
||||
| 2026-01-13 12:16:09 | 2026-01-13 12:19:57 | 3,7912854 | 7,3 m3 | |
|
|
||||
| 2026-01-13 12:07:24 | 2026-01-13 12:13:29 | 6,08921595 | 11,1 m3 | |
|
|
||||
| 2026-01-13 12:00:00 | 2026-01-13 12:05:20 | 5,338674933333333 | 10,2 m3 | |
|
|
||||
| 2026-01-13 11:16:27 | 2026-01-13 11:20:06 | 3,6622368833333336 | 7,2 m3 | |
|
|
||||
| 2026-01-13 11:09:15 | 2026-01-13 11:13:38 | 4,38202825 | 7,9 m3 | |
|
|
||||
| 2026-01-13 11:00:00 | 2026-01-13 11:06:28 | 6,469105033333333 | 10,9 m3 | |
|
|
||||
| 2026-01-13 10:17:11 | 2026-01-13 10:18:34 | 1,3839193333333335 | 2,4 m3 | |
|
|
||||
| 2026-01-13 10:10:40 | 2026-01-13 10:15:03 | 4,38629675 | 8,2 m3 | |
|
|
||||
| 2026-01-13 10:00:00 | 2026-01-13 10:07:42 | 7,709760066666666 | 14,6 m3 | |
|
|
||||
| 2026-01-13 09:08:54 | 2026-01-13 09:09:31 | 0,61920775 | 1,2 m3 | |
|
|
||||
| 2026-01-13 09:00:00 | 2026-01-13 09:06:39 | 6,655811716666666 | 10,6 m3 | |
|
|
||||
| 2026-01-12 21:00:00 | 2026-01-12 21:02:21 | 2,3509089166666666 | 3,6 m3 | |
|
|
||||
| 2026-01-12 20:00:00 | 2026-01-12 20:04:59 | 4,984916516666667 | 10,1 m3 | |
|
|
||||
Batch #1
Start Time
2026-01-16 15:00
End Time
2026-01-16 15:07
Durată
7,447959833333333
Production
13,2 m3
Batch #2
Start Time
2026-01-16 14:00
End Time
2026-01-16 14:05
Durată
5,841763516666666
Production
10,8 m3
Batch #3
Start Time
2026-01-16 13:15
End Time
2026-01-16 13:18
Durată
2,2738449833333334
Production
4,5 m3
Batch #4
Start Time
2026-01-16 13:07
End Time
2026-01-16 13:13
Durată
5,577031983333333
Production
9,0 m3
Batch #5
Start Time
2026-01-16 13:00
End Time
2026-01-16 13:06
Durată
6,69514365
Production
12,1 m3
Batch #6
Start Time
2026-01-16 12:16
End Time
2026-01-16 12:21
Durată
4,941518966666666
Production
7,7 m3
Batch #7
Start Time
2026-01-16 12:09
End Time
2026-01-16 12:14
Durată
4,167635433333333
Production
8,0 m3
Batch #8
Start Time
2026-01-16 12:00
End Time
2026-01-16 12:06
Durată
6,9578300833333335
Production
10,7 m3
Batch #9
Start Time
2026-01-16 11:21
End Time
2026-01-16 11:21
Durată
0,6936281999999999
Production
1,5 m3
Batch #10
Start Time
2026-01-16 11:13
End Time
2026-01-16 11:18
Durată
5,423575516666667
Production
8,9 m3
Batch #11
Start Time
2026-01-16 11:07
End Time
2026-01-16 11:12
Durată
4,368319666666666
Production
7,7 m3
Batch #12
Start Time
2026-01-16 11:00
End Time
2026-01-16 11:05
Durată
5,4781839
Production
9,2 m3
Batch #13
Start Time
2026-01-16 10:17
End Time
2026-01-16 10:19
Durată
1,4072688999999998
Production
2,9 m3
Batch #14
Start Time
2026-01-16 10:07
End Time
2026-01-16 10:15
Durată
7,659382216666667
Production
12,9 m3
Batch #15
Start Time
2026-01-16 10:00
End Time
2026-01-16 10:05
Durată
5,290225449999999
Production
9,1 m3
Batch #16
Start Time
2026-01-16 09:07
End Time
2026-01-16 09:10
Durată
2,36289875
Production
3,8 m3
Batch #17
Start Time
2026-01-16 09:00
End Time
2026-01-16 09:05
Durată
5,095748066666667
Production
9,3 m3
Batch #18
Start Time
2026-01-15 21:00
End Time
2026-01-15 21:02
Durată
2,238550066666667
Production
3,7 m3
Batch #19
Start Time
2026-01-15 20:00
End Time
2026-01-15 20:04
Durată
4,286952333333333
Production
8,3 m3
Batch #20
Start Time
2026-01-15 19:07
End Time
2026-01-15 19:11
Durată
4,442751583333333
Production
8,2 m3
Batch #21
Start Time
2026-01-15 19:00
End Time
2026-01-15 19:04
Durată
4,74181395
Production
8,3 m3
Batch #22
Start Time
2026-01-15 18:10
End Time
2026-01-15 18:14
Durată
3,9381064833333337
Production
6,9 m3
Batch #23
Start Time
2026-01-15 18:00
End Time
2026-01-15 18:08
Durată
8,1424083
Production
13,7 m3
Batch #24
Start Time
2026-01-15 17:08
End Time
2026-01-15 17:13
Durată
5,2598218333333335
Production
10,0 m3
Batch #25
Start Time
2026-01-15 17:00
End Time
2026-01-15 17:07
Durată
7,302251633333333
Production
12,9 m3
Batch #26
Start Time
2026-01-15 16:07
End Time
2026-01-15 16:13
Durată
6,401141683333334
Production
12,8 m3
Batch #27
Start Time
2026-01-15 16:00
End Time
2026-01-15 16:05
Durată
5,8363243
Production
10,0 m3
Batch #28
Start Time
2026-01-15 15:07
End Time
2026-01-15 15:09
Durată
1,4775679333333334
Production
2,4 m3
Batch #29
Start Time
2026-01-15 15:00
End Time
2026-01-15 15:06
Durată
6,083153133333334
Production
9,7 m3
Batch #30
Start Time
2026-01-15 14:00
End Time
2026-01-15 14:04
Durată
4,4220784166666665
Production
8,8 m3
Batch #31
Start Time
2026-01-15 13:06
End Time
2026-01-15 13:12
Durată
6,097223516666667
Production
11,1 m3
Batch #32
Start Time
2026-01-15 13:00
End Time
2026-01-15 13:05
Durată
5,238422616666667
Production
9,8 m3
Batch #33
Start Time
2026-01-15 12:09
End Time
2026-01-15 12:15
Durată
5,142347183333333
Production
8,9 m3
Batch #34
Start Time
2026-01-15 12:00
End Time
2026-01-15 12:07
Durată
7,328212716666667
Production
13,3 m3
Batch #35
Start Time
2026-01-15 11:13
End Time
2026-01-15 11:15
Durată
2,29864895
Production
4,1 m3
Batch #36
Start Time
2026-01-15 11:07
End Time
2026-01-15 11:12
Durată
4,1374000833333335
Production
8,5 m3
Batch #37
Start Time
2026-01-15 11:00
End Time
2026-01-15 11:06
Durată
6,167681366666667
Production
11,1 m3
Batch #38
Start Time
2026-01-15 10:07
End Time
2026-01-15 10:12
Durată
4,3324270333333335
Production
8,1 m3
Batch #39
Start Time
2026-01-15 10:00
End Time
2026-01-15 10:06
Durată
6,396019766666667
Production
11,5 m3
Batch #40
Start Time
2026-01-15 09:00
End Time
2026-01-15 09:06
Durată
6,035547183333334
Production
9,9 m3
Batch #41
Start Time
2026-01-14 21:00
End Time
2026-01-14 21:02
Durată
2,0004331166666667
Production
4,4 m3
Batch #42
Start Time
2026-01-14 20:00
End Time
2026-01-14 20:05
Durată
5,55911845
Production
9,5 m3
Batch #43
Start Time
2026-01-14 19:07
End Time
2026-01-14 19:11
Durată
4,374333433333334
Production
7,8 m3
Batch #44
Start Time
2026-01-14 19:00
End Time
2026-01-14 19:05
Durată
5,077721966666667
Production
9,5 m3
Batch #45
Start Time
2026-01-14 18:13
End Time
2026-01-14 18:16
Durată
2,470014716666667
Production
3,5 m3
Batch #46
Start Time
2026-01-14 18:06
End Time
2026-01-14 18:12
Durată
5,707532116666667
Production
11,2 m3
Batch #47
Start Time
2026-01-14 18:00
End Time
2026-01-14 18:04
Durată
4,785178733333334
Production
7,8 m3
Batch #48
Start Time
2026-01-14 17:09
End Time
2026-01-14 17:16
Durată
7,391958216666667
Production
13,4 m3
Batch #49
Start Time
2026-01-14 17:00
End Time
2026-01-14 17:06
Durată
6,174017866666667
Production
12,1 m3
Batch #50
Start Time
2026-01-14 16:16
End Time
2026-01-14 16:18
Durată
1,9799059666666667
Production
3,5 m3
Batch #51
Start Time
2026-01-14 16:09
End Time
2026-01-14 16:14
Durată
4,334633183333334
Production
8,7 m3
Batch #52
Start Time
2026-01-14 16:00
End Time
2026-01-14 16:07
Durată
7,200663433333333
Production
13,1 m3
Batch #53
Start Time
2026-01-14 15:07
End Time
2026-01-14 15:10
Durată
2,3764811833333335
Production
4,2 m3
Batch #54
Start Time
2026-01-14 15:00
End Time
2026-01-14 15:05
Durată
5,863148833333333
Production
10,4 m3
Batch #55
Start Time
2026-01-14 14:00
End Time
2026-01-14 14:05
Durată
5,5077487
Production
10,2 m3
Batch #56
Start Time
2026-01-14 13:13
End Time
2026-01-14 13:15
Durată
2,7785771666666665
Production
5,7 m3
Batch #57
Start Time
2026-01-14 13:06
End Time
2026-01-14 13:11
Durată
4,390876866666667
Production
8,4 m3
Batch #58
Start Time
2026-01-14 13:00
End Time
2026-01-14 13:04
Durată
4,98724195
Production
9,7 m3
Batch #59
Start Time
2026-01-14 12:12
End Time
2026-01-14 12:17
Durată
5,26110825
Production
8,8 m3
Batch #60
Start Time
2026-01-14 12:06
End Time
2026-01-14 12:10
Durată
4,4092522
Production
8,3 m3
Batch #61
Start Time
2026-01-14 12:00
End Time
2026-01-14 12:04
Durată
4,524985683333333
Production
8,5 m3
Batch #62
Start Time
2026-01-14 11:16
End Time
2026-01-14 11:16
Durată
0,7237914166666666
Production
1,5 m3
Batch #63
Start Time
2026-01-14 11:07
End Time
2026-01-14 11:14
Durată
7,82077885
Production
12,2 m3
Batch #64
Start Time
2026-01-14 11:00
End Time
2026-01-14 11:05
Durată
5,3912272
Production
10,2 m3
Batch #65
Start Time
2026-01-14 10:15
End Time
2026-01-14 10:18
Durată
2,4494065333333332
Production
3,9 m3
Batch #66
Start Time
2026-01-14 10:07
End Time
2026-01-14 10:13
Durată
6,0811177333333335
Production
10,7 m3
Batch #67
Start Time
2026-01-14 10:00
End Time
2026-01-14 10:04
Durată
4,719192250000001
Production
8,6 m3
Batch #68
Start Time
2026-01-14 09:08
End Time
2026-01-14 09:09
Durată
0,8358671
Production
1,4 m3
Batch #69
Start Time
2026-01-14 09:00
End Time
2026-01-14 09:05
Durată
5,802086366666667
Production
11,1 m3
Batch #70
Start Time
2026-01-13 21:00
End Time
2026-01-13 21:02
Durată
2,9232507333333335
Production
5,5 m3
Batch #71
Start Time
2026-01-13 20:00
End Time
2026-01-13 20:05
Durată
5,797508466666667
Production
10,5 m3
Batch #72
Start Time
2026-01-13 19:10
End Time
2026-01-13 19:13
Durată
3,020184583333333
Production
5,3 m3
Batch #73
Start Time
2026-01-13 19:00
End Time
2026-01-13 19:07
Durată
7,864943433333334
Production
14,2 m3
Batch #74
Start Time
2026-01-13 18:17
End Time
2026-01-13 18:18
Durată
0,8542813
Production
1,5 m3
Batch #75
Start Time
2026-01-13 18:09
End Time
2026-01-13 18:15
Durată
6,1009712
Production
10,8 m3
Batch #76
Start Time
2026-01-13 18:00
End Time
2026-01-13 18:06
Durată
6,839012016666667
Production
12,5 m3
Batch #77
Start Time
2026-01-13 17:16
End Time
2026-01-13 17:19
Durată
2,9368586666666667
Production
5,5 m3
Batch #78
Start Time
2026-01-13 17:07
End Time
2026-01-13 17:14
Durată
6,741951816666667
Production
11,5 m3
Batch #79
Start Time
2026-01-13 17:00
End Time
2026-01-13 17:05
Durată
5,570017483333333
Production
10,1 m3
Batch #80
Start Time
2026-01-13 16:16
End Time
2026-01-13 16:19
Durată
2,9972925666666668
Production
5,9 m3
Batch #81
Start Time
2026-01-13 16:09
End Time
2026-01-13 16:13
Durată
4,701420233333334
Production
7,7 m3
Batch #82
Start Time
2026-01-13 16:00
End Time
2026-01-13 16:07
Durată
7,810635016666667
Production
13,0 m3
Batch #83
Start Time
2026-01-13 15:06
End Time
2026-01-13 15:10
Durată
3,6313707166666664
Production
7,0 m3
Batch #84
Start Time
2026-01-13 15:00
End Time
2026-01-13 15:05
Durată
5,33261465
Production
9,6 m3
Batch #85
Start Time
2026-01-13 14:00
End Time
2026-01-13 14:05
Durată
5,8013302
Production
11,5 m3
Batch #86
Start Time
2026-01-13 13:08
End Time
2026-01-13 13:15
Durată
6,7748650999999995
Production
12,5 m3
Batch #87
Start Time
2026-01-13 13:00
End Time
2026-01-13 13:06
Durată
6,235145716666667
Production
11,9 m3
Batch #88
Start Time
2026-01-13 12:16
End Time
2026-01-13 12:19
Durată
3,7912854
Production
7,3 m3
Batch #89
Start Time
2026-01-13 12:07
End Time
2026-01-13 12:13
Durată
6,08921595
Production
11,1 m3
Batch #90
Start Time
2026-01-13 12:00
End Time
2026-01-13 12:05
Durată
5,338674933333333
Production
10,2 m3
Batch #91
Start Time
2026-01-13 11:16
End Time
2026-01-13 11:20
Durată
3,6622368833333336
Production
7,2 m3
Batch #92
Start Time
2026-01-13 11:09
End Time
2026-01-13 11:13
Durată
4,38202825
Production
7,9 m3
Batch #93
Start Time
2026-01-13 11:00
End Time
2026-01-13 11:06
Durată
6,469105033333333
Production
10,9 m3
Batch #94
Start Time
2026-01-13 10:17
End Time
2026-01-13 10:18
Durată
1,3839193333333335
Production
2,4 m3
Batch #95
Start Time
2026-01-13 10:10
End Time
2026-01-13 10:15
Durată
4,38629675
Production
8,2 m3
Batch #96
Start Time
2026-01-13 10:00
End Time
2026-01-13 10:07
Durată
7,709760066666666
Production
14,6 m3
Batch #97
Start Time
2026-01-13 09:08
End Time
2026-01-13 09:09
Durată
0,61920775
Production
1,2 m3
Batch #98
Start Time
2026-01-13 09:00
End Time
2026-01-13 09:06
Durată
6,655811716666666
Production
10,6 m3
Batch #99
Start Time
2026-01-12 21:00
End Time
2026-01-12 21:02
Durată
2,3509089166666666
Production
3,6 m3
Batch #100
Start Time
2026-01-12 20:00
End Time
2026-01-12 20:04
Durată
4,984916516666667
Production
10,1 m3